![Baldor GLC10 Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/baldor/glc10/glc10_installation-and-operating-manual_3577857039.webp)
Receiving & Installation 3‐15
MN2408
Post Installation Checks
Continued
22. With the engine running, several checks must be made:
a.
Verify there are no fuel leaks. If a fuel leak is detected, stop the engine
immediately (move the Master Control Switch to the “Stop” position) and
repair the leak before proceeding.
b.
Verify there are no coolant or oil leaks. If a leak is detected, stop the engine
immediately and repair the leak before proceeding.
c.
Verify that operation is smooth. If belt squeals, vibrations or other sources of
noise exist, stop the engine immediately and repair before proceeding.
d.
Verify that the correct voltage exists (line-to-line and line-to-neutral) at the
generator and at the transfer switch.
e.
Minor adjustment of the output voltage is made using the “Voltage Adjust”
potentiometer on the control panel.
WARNING: Engine coolant is under pressure and is near the boiling point of water when engine is hot.
Do not open the coolant system until the engine has completely cooled. Hot coolant can
cause severe burns and other injuries. When engine is cool, coolant level can be checked.
23. After the operation checks are made, stop the engine (move the Master Control Switch
to the “Stop” position) and wait at least 2 hours for the engine to cool. When the
engine is cool, check engine oil and coolant levels as instructed in the engine operation
manual.
24. Close all enclosure covers. The post installation checks are now complete.
Содержание GLC10
Страница 12: ...2 2 General Information MN2408...
Страница 24: ...2 14 General Information MN2408...
Страница 40: ...3 16 Receiving Installation MN2408...
Страница 58: ...4 18 Operation MN2408 Figure 4 15 Engine Controller Inputs Outputs...
Страница 70: ...4 30 Operation MN2408 Figure 4 16 Configuration Data Sheet j j j j j j j j j...
Страница 74: ...4 34 Operation MN2408...
Страница 88: ...A 10 Series GLC MN2408...
Страница 90: ...B 2 Series GLC MN2408 Figure B 11 Customer Interface Connection Diagram MEC20 MEC2...
Страница 91: ...Series GLC B 3 MN2408 Figure B 12 Customer Interface w o Breaker Power Connection Diagram...
Страница 92: ...B 4 Series GLC MN2408 Figure B 13 Single Phase w o Breaker Connection Diagram...
Страница 93: ...Series GLC B 5 MN2408 Figure B 14 Single Phase One Breaker Connection Diagram...
Страница 94: ...B 6 Series GLC MN2408 Figure B 15 Single Phase Two Breaker Connection Diagram...
Страница 95: ...Series GLC B 7 MN2408 Figure B 16 Single Phase Connection Diagram Wire 1 0 and Larger w Breaker...
Страница 96: ...B 8 Series GLC MN2408 Figure B 17 Single Phase Connection Diagram Wire 1 0 and Smaller w Breaker...
Страница 97: ...Series GLC B 9 MN2408 Figure B 18 Single Phase Connection Diagram Wire 1 0 and Smaller w o Breaker...
Страница 98: ...B 10 Series GLC MN2408 Figure B 19 Single Phase Connection Diagram Wire Larger than 1 0 w o Breaker...
Страница 99: ...Series GLC B 11 MN2408 Figure B 20 Three Phase Connection Diagram...
Страница 100: ...B 12 Series GLC MN2408 Figure B 21 Three Phase Connection Diagram with PMG...
Страница 101: ...Series GLC B 13 MN2408 Figure B 22 Three Phase Connection Diagram Wire 1 0 and larger...
Страница 102: ...B 14 Series GLC MN2408 Figure B 23 Three Phase Connection Diagram Wire Larger than 1 0 w Breaker...
Страница 103: ...Series GLC B 15 MN2408 Figure B 24 Three Phase Connection Diagram Wire 1 0 and Smaller w Breaker...
Страница 104: ...B 16 Series GLC MN2408 Figure B 25 Three Phase Connection Diagram Wire Larger than 1 0 w o Breaker...
Страница 105: ...Series GLC B 17 MN2408 Figure B 26 Three Phase Connection Diagram Wire 1 0 and Smaller w o Breaker...
Страница 106: ...B 18 Series GLC MN2408 Figure B 27 Control Box Connections with MEC20 Controller...
Страница 107: ...Series GLC B 19 MN2408 Figure B 28 Control Box Connections with MEC20 Controller Governor...
Страница 108: ...B 20 Series GLC MN2408 Figure B 29 Control Box Connections with MEC2 Controller...
Страница 109: ...Series GLC B 21 MN2408 Figure B 30 Engine Wiring Woodward 4 3L GM...
Страница 110: ...B 22 Series GLC MN2408 Figure B 31 Engine Wiring Woodward 5 7L GM...
Страница 111: ...Series GLC B 23 MN2408 Figure B 32 Engine Wiring Woodward 8 1L GM...
Страница 112: ...B 24 Series GLC MN2408...
Страница 113: ...Baldor District Offices...