background image

12  

ESSENCIA DROP-IN - installation

1 800 463.2187 

 

Monday to Thursday from 8 a.m. to 8 p.m.  (EST) . Friday from 8 a.m. to 5 p.m. (EST)  

Printed in Canada. Copyright © April 2017 BainUltra Inc. All rights reserved. 

45200653

ESSENCIA

® 

 COLLECTION - DROP-IN MODELS

INSTALLATION INSTRUCTIONS 

DROP-IN INSTALLATION WITH REMOTE MOUNTING OF TURBINE  
ESSENCIA OVAL 7236 & DESIGN 7438 

WARNING

•   Leave the plastic film on the bath and place a drop-cloth a cover in the bath during installation.

•  Connect the drain.

•  Perform a leak test before completing the box installation.
•   Once the bath is placed on the floor, it is recommended to leave a clearance of 1/16’’ (0.2 cm)  

between the deck surface of the bath and the top of the box.

•   Apply a bead of silicone on the contour of the bath to make sure the top of the box is sealed.

 

FOR NEXT STEPS, PLEASE REFER TO THE

 ESSENCIA – INSTALLATION INSTRUCTIONS MANUAL

2

 

TURBINE & GEYSAIR INSTALLATION (FOR THERMOMASSEUR

®

) ...........................................................PAGE 12

3

 

ELECTRICAL WIRING OF OPTIONAL COMPONENTS ............................................................................PAGE 12

4

 

BATH INSTALLATION

ESSENCIA OVAL 7236

ESSENCIA DESIGN 7438

5“  (13 cm)

minimum

4“  (10 cm)

minimum

Floor Surface

Содержание ESSENCIA OVAL 7236

Страница 1: ...7438 INSTALLATION INSTRUCTIONS ADDENDUM to ESSENCIA INSTALLATION INSTRUCTIONS IMPORTANT INFORMATION FOR THE INSTALLER AND THE OWNER This document should always be accompanied by the ESSENCIA INSTALLA...

Страница 2: ...N DROP IN MODELS INSTALLATION INSTRUCTIONS TABLE OF CONTENT IMPORTANT SAFETY INSTRUCTIONS 1 PARTS TOOLS 3 SITE PREPARATION 5 INSTALLATION DROP IN WITH REMOTE MOUNTING OF TURBINE ESSENCIA OVAL 7236 DES...

Страница 3: ...e drugs or alcohol before or during the use of a Hydro thermo massage bathtub equipped with a heater Use this unit only for its intended purposes or as described in this manual Use only accessories or...

Страница 4: ...90 C Canada only for permanently connected units A green colored terminal or a wire connector marked g gr ground or grounding is provided within the terminal compartment not applicable if unit suppli...

Страница 5: ...ng nut 1 C Strainer 1 D Rubber seal 1 E PVC Wired drain shoe 1 F PVC Piping 1 1 2 x2 1 G PVC Tee Connector 1 1 2 F F 1 DESCRIPTION QTY H Plated drain clicker 1 I Strainer 1 J Rubber seal 1 K Brass dra...

Страница 6: ...ESSENCIA COLLECTION DROP IN MODELS INSTALLATION INSTRUCTIONS B C D A PARTS TOOLS REQUIRED STANDARD PARTS THERMOMASSEUR DESCRIPTION QTY A Turbine 1 B MiaPlus Control Design 7438 1 C MiaMulti Control Ov...

Страница 7: ...erneath the bath can support 1500 lb 680 kg The bath may sit directly on the floor The bathtub can also sit on a concrete bed In that case it is recommended to isolate the concrete between two plastic...

Страница 8: ...653 ESSENCIA COLLECTION DROP IN MODELS INSTALLATION INSTRUCTIONS PLUMBING INTALLATION TEMPLATES FLOOR LAYOUT FOR PIPES AND ACCESS ESSENCIA OVAL 7236 ESSENCIA DESIGN 7438 DROP IN INSTALLATION WITH REMO...

Страница 9: ...ent applications or are protected by patents ESSENCIA COLLECTION DROP IN MODELS INSTALLATION INSTRUCTIONS 1 PLUMBING ESSENCIA OVAL 7236 Assembly of the waste overflow DROP IN INSTALLATION WITH REMOTE...

Страница 10: ...l 2017 BainUltra Inc All rights reserved 45200653 ESSENCIA COLLECTION DROP IN MODELS INSTALLATION INSTRUCTIONS DROP IN INSTALLATION WITH REMOTE MOUNTING OF TURBINE ESSENCIA OVAL 7236 DESIGN 7438 1 PLU...

Страница 11: ...installation template DROP IN INSTALLATION WITH REMOTE MOUNTING OF TURBINE ESSENCIA OVAL 7236 DESIGN 7438 Box Structure Installation Template IF NEEDED make an opening of sufficient dimension in the...

Страница 12: ...1 16 0 2cm considering the thickness of the glue of the finishing Adjust the height of the bath to the floor if necessary The bath is molded with a slope towards the drain If the bathtub is levelled a...

Страница 13: ...rawn on the installation template at 1 2 5 cm from the outside edge of the bath area Keep an access to perform electrical plumbing connections Keep minimum 22 x18 55cmx46cm access to perform electrica...

Страница 14: ...bath during installation Connect the drain Perform a leak test before completing the box installation Once the bath is placed on the floor it is recommended to leave a clearance of 1 16 0 2cm between...

Страница 15: ...OVAL 7236 DESIGN 7438 5 ELECTRONIC CONTROL INSTALLATION MIAPLUS DESIGN 7438 MIAMULTI OVAL 7236 PAGE 15 6 REMOTE MOUNTING OF TURBINE PAGE16 7 REMOTE MOUNTING OF TURBINE AIR PIPE THERMOMASSEUR PAGE 17...

Страница 16: ...MODELS INSTALLATION INSTRUCTIONS DROP IN INSTALLATION WITH FACTORY INSTALLED TURBINE ESSENCIA OVAL 7236 A Turbine B WarmTouchShell C Chromatherapy LED D MiaPlus E MiaMulti F AromaCloud C A D E F B FO...

Страница 17: ...h the ground and its clearance with the opening on top of the box Use shims if necessary and attach them to the ground WARNING Check the spacing from the bottom of the deck to the top of the plywood p...

Страница 18: ...e box opening for the final installation of the bath on the floor A ESSENCIA DESIGN 7438 DRAIN CONNECTION B DECK OF THE BATH CLEARANCE 4 10cm minimum WARNING Leave the plastic film on the bath and pla...

Страница 19: ...er in the bath during installation Cut the bath contour on the support panel according to the EXTERIOR contour line drawn on the installation template AND LEAVE an additional 1 4 0 6cm of clearance Ch...

Страница 20: ...on the top panel following the UNDERMOUNT line of the installation template Apply a bead of silicone on the contour of the bath to make sure the bottom of the box is sealed 5 ELECTRONIC CONTROL INSTA...

Отзывы: