10
ESSENCIA DROP-IN - installation
1 800 463.2187
Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
Printed in Canada. Copyright © April 2017 BainUltra Inc. All rights reserved.
45200653
ESSENCIA
®
COLLECTION - DROP-IN MODELS
INSTALLATION INSTRUCTIONS
DROP-IN INSTALLATION WITH REMOTE MOUNTING OF TURBINE
ESSENCIA OVAL 7236 & DESIGN 7438
Deck of the bath
Plywoods
Wooden structure (2“ x 3“)
WARNING FOR DROP-IN ONLY
•
Check the spacing from the bottom of the deck
to the top of the plywood panel to clear the thick-
ness of the finishing material plus a
clearance
of at least 1/16” (0.2 cm),
considering the
thickness of the glue of the finishing. Adjust
the height of the bath to the floor if necessary.
• The bath is molded with a slope towards the
drain. If the bathtub is levelled according to bath
deck surface, the water will drain completely.
2
DROP-IN – CONSTRUCTION
(cont’d)
Fix INTERMEDIATE panels (plywood recommended)
on the sides and at the top.
Check the bath level with the ground and
its clearance with the opening on top of the
box. Use shims if necessary and attach them
to the ground.
WARNING
• Draw the outside contour of the bath on the interme-
diate top panel according to the
“DROP-IN” cut line
drawn on the installation template
• Cut the intermediate top panel at 1” (2.5 cm) inside the
outline of tub deck dimension.
• Keep an access for electrical & plumbing connections.