2
ESSENCIA DROP-IN - installation
1 800 463.2187
Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
Printed in Canada. Copyright © April 2017 BainUltra Inc. All rights reserved.
45200653
ESSENCIA
®
COLLECTION - DROP-IN MODELS
INSTALLATION INSTRUCTIONS
READ AND FOLLOW ALL INSTRUCTIONS • SAVE THESE INSTRUCTIONS
THIS DOCUMENT SUPERCEDES THE INSTALLATION INSTRUCTION IN THE OWNER’S MANUAL.
ELECTRICAL CONNECTIONS:
• Never drop or insert objects into any openings.
• The Thermomasseur
®
must be connected only to a supply circuit that is protected by a 20 amp class A ground fault circuit
interrupter (GFCI). Optional therapies such as Chromatherapy and/or 2
nd
heated backrest and/or WarmTouchShell
®
must be
connected to a supply circuit that is protected by a 15 amp class A ground fault circuit interrupter (GFCI). This interrupter is
supplied by a certified electrician and must be tested on a regular basis in accordance with manufacturer’s instructions. The GFCI
ground must be connected. If defective, do not use the Thermomasseur. Disconnect immediately and call a certified electrician.
• Use 12 AWG (or greater) copper conductors that resist temperatures of at least 194ºF (90ºC).
•
Canada only:
for permanently connected units. A green-colored terminal (or a wire connector marked g., gr., ground
or grounding) is provided within the terminal compartment (not applicable if unit supplied with an electric plug).
To reduce the risk of electrocution, connect this terminal or connector to the grounding terminal of your electric service
or supply panel with conductor equivalent in size to the circuit conductors supplying the equipment and be 12 AWG
or more.
• All electrical connections must be carried out by a certified electrician and must respect federal, provincial/state,
and local building codes and regulations.
• Install in accordance with manufacturer’s installation instructions.
• For Geysair-equipped baths using remote turbine installation (not mounted on the bath), grounding continuity must be tested
between the bath grounding terminal
and the bath power supply. Failure to perform the grounding continuity test could
result in serious personal injury.
WATER LEAK TEST
• Once plumbing is fully installed and before beginning any other work, fill the ThermoMasseur
®
with water to overflow level and
wait 30 minutes. Check all plumbing hook-ups and bath for leaks. BainUltra
®
is not responsible for any water damage caused by
improper installation (see Warranty section).
IMPORTANT SAFETY INSTRUCTIONS
(cont’d)
PERTAINING TO RISKS OF FIRE, ELECTROCUTION OR PERSONAL INJURY