
INSTALLATION
IEPMU01/02 POWER MOUNTING UNIT INSTALLATION
3 - 14
I-E96-508C
®
14. Attach one spade lug end of 10 AWG wire assembly (part
number 206632285_46) to PMU +15 VDC. Attach the other
spade lug end to system power bus bar +15 VDC.
15. Attach one spade lug end of 10 AWG wire assembly (part
number 206632285_46) to PMU -15 VDC. Attach the other
spade lug end to system power bus bar -15 VDC.
16. Attach one spade lug end of 18 AWG wire assembly (part
number 20663228_49) to PMU STATUS. Attach the other
spade lug end to system power bus bar status.
17. Attach spade lugs of cable assembly (part number
6637813_1) for signal connections from IEPEP04 connector J2
to the system power bus bar appropriately.
18. Verify that the circuit breakers on the PEP are in the OFF
position.
19. Unplug all process and slave modules from the MMU back-
plane.
20. Verify that all wiring connections are complete before turn-
ing on the source power.
21. Use a voltmeter to measure 24 VDC or 48 VDC power at
TB3 and TB7.
Figure 3-8. Heat Shrink Tubing for 24 VDC Connection
6632285 48
I/O COM
6632285 48
HEAT SHRINK
TUBING
PMU
BUS BAR
STANDOFF
+24 V
NOTE: AFTER JUMPER CONNECTION IS MADE, SLIDE HEAT SHRINK
TUBING SUPPLIED WITH P/N 6632285 48 OVER CONNECTION
UNTIL CONNECTION IS COVERED COMPLETELY AND SHRINK INTO
PLACE WITH HEAT GUN.
TP50375B