INSTALLATION
SETUP/PHYSICAL INSTALLATION
2 - 8
I-E96-403A
®
The NTAI02 is ready for operation if:
1. The circuit board is mounted in the field termination panel.
2. All required cables are connected to the termination unit.
3. All required field wires are connected to the termination
unit and have been verified.
4. Terminal block covers are installed.
5. Power is connected and applied to the termination unit.