background image

 

 

13 

13 

INSTALLATION 

IMPORTANT: 

Consider the following when looking for a suitable location to place the machine: 

  Overall weight of the machine. 

  Weight of material being processed. 

  Sizes of material to be processed through the machine.

 

  Space needed for auxiliary stands, work tables, or other machinery.

 

  Clearance from walls and other obstacles.

 

  Maintain an adequate working area around the machine for safety. 

  Have the work area well illuminated with proper lighting. 

  Keep the floor free of oil and make sure it is not slippery. 

  Remove scrap and waste materials regularly, and make sure the work area is free from 

obstructing objects.

 

  If long lengths of material are to be fed into the machine, make sure that they will not extend 

into any aisles.

 

 

LEVELING:

 The machine should be sited on a level, concrete floor. Provisions for securing it 

should be in position prior to placing the machine. The accuracy of any machine depends on 
the precise placement of it to the mounting surface. 

 

FLOOR:

 This tool distributes a large amount of weight over a small area. Make certain that 

the floor is capable of supporting the weight of the machine, work stock, and the operator. 
The floor should also be a level surface. If the unit wobbles or rocks once in place, be sure to 
eliminate by using shims. 

 

WORKING CLEARANCES: 

Take into consideration the size of the material to be 

processed. Make sure that you allow enough space for you to operate the machine freely. 

 
 
 
 
 
 
 
 
 
 
 
 

Содержание WJT-4747-HD

Страница 1: ...AL Pty LTD IS PROHIBITED Baileigh Industrial Pty LTD does not assume and hereby disclaims any liability for any damage or loss caused by an omission or error in this Operator s Manual resulting from a...

Страница 2: ...alued Customer 8 TECHNICAL SPECIFICATIONS 10 TECHNICAL SUPPORT 10 UNPACKING AND CHECKING CONTENTS 11 Cleaning 11 TRANSPORTING AND LIFTING 12 INSTALLATION 13 ASSEMBLY AND SET UP 14 Attention Before Ope...

Страница 3: ...designated agent employee of the Company 2 4 The Buyer must ensure that the terms of its order and any applicable specification are complete and accurate 2 5 Any quotation given by the Company is an o...

Страница 4: ...y except a solvent voluntary liquidation for the purpose only of reconstruction or amalgamation or has a receiver and or manager administrator or administrative receiver appointed of its undertaking o...

Страница 5: ...9 9 All electrical components and gearboxes carry a one year replacement warranty from the manufacturer This warranty does not include labour or shipping costs 10 RETURNS 10 1 The Buyer shall not be e...

Страница 6: ...of the English courts 16 COMMUNICATIONS 16 1 All communications between the parties about this Contract must be in writing and delivered by hand or sent by pre paid first class post or sent by facsimi...

Страница 7: ...tion of the functional parts of the machine Capacity charts Set up and start up instructions Machine operation Scheduled maintenance Parts lists GENERAL NOTES After receiving your equipment remove the...

Страница 8: ...es a hazard or unsafe practice that will result in severe Injury or Death Safety signs with signal word DANGER or WARNING are typically near specific hazards General precautions are listed on CAUTION...

Страница 9: ...Wear safety glasses or suitable eye protection when working on or around machinery BEWARE OF CRUSH HAZARD NEVER place your hands fingers or any part of your body in the die area of this machine Wear...

Страница 10: ...king any modifications or alterations to a Baileigh machine Modifications or alterations to a machine may pose a substantial risk of injury to the operator or others and may do substantial damage to t...

Страница 11: ...fect proper machine operation 15 Observe work area conditions DO NOT use machines or power tools in damp or wet locations Do not expose to rain Keep work area well lighted DO NOT use electrically powe...

Страница 12: ...bject line Tech Support handles questions on machine setup schematics warranty issues and individual parts needs other than die sets and blades List the model number serial number and contact name and...

Страница 13: ...age painted surfaces Follow manufacturer s label instructions when using any type of cleaning product After cleaning wipe unpainted metal surfaces with a light coating of quality oil or grease for pro...

Страница 14: ...se a fork lift with sufficient lifting capacity and forks that are long enough to reach the complete width of the machine Remove the securing bolts that attach the machine to the pallet Approaching th...

Страница 15: ...g objects If long lengths of material are to be fed into the machine make sure that they will not extend into any aisles LEVELING The machine should be sited on a level concrete floor Provisions for s...

Страница 16: ...nd periodically during use Ensure reliable conductive ground connection Periodically clean the welding slag on the platform surface with oil stone To the extent possible try not to fixture in the same...

Страница 17: ...g legs Level the table as require Table Top Table top has a perforated grid plate with D28 mounting holes precisely laid out on a 100mm x 100mm grid pattern These holes can be used for various positio...

Страница 18: ...s are also easily combined with the other components from the optional accessory package Insert the post is the desired hole adjust the height and tighten the clamp Lock Pin Fast Lock Pin The fast loc...

Страница 19: ...not interfere externally Other accessories 1 Platform and accessories or attachments and accessories are pressed by the pin through the holes Users can assemble a reasonable combination according to p...

Страница 20: ...oper maintenance can increase the life expectancy of your machine 1 Keep the platform clean spray anti rust oil when do not use for while 2 Keep the hole inside clean and clear with brush regularly 3...

Страница 21: ...19 19 NOTES...

Страница 22: ...20 20 NOTES...

Страница 23: ...21 21 NOTES...

Страница 24: ...NTARIO CA 91761 PHONE 920 684 4990 FAX 920 684 3944 BAILEIGH INDUSTRIAL LTD UNIT D SWIFT POINT SWIFT VALLEY INDUSTRIAL ESTATE RUGBY WEST MIDLANDS CV21 1QH UNITED KINGDOM PHONE 44 0 24 7661 9267 FAX 44...

Отзывы: