background image

 

 

Force Majeure.

 Seller shall not be responsible for any delay in the delivery of, or failure to deliver, Goods due to 

causes beyond Seller’s reasonable control including, without limitation, acts of God, acts of war or terrorism, enemy 
actions,  hostilities,  strikes,  labor  difficulties,  embargoes,  non-delivery  or  late  delivery  of  materials,  parts  and 
equipment  or  transportation  delays  not  caused  by  the  fault  of  Seller,  delays  caused  by  civil  authorities, 
governmental regulations or orders, fire, lightening, natural disasters or any other cause beyond Seller

’s reasonable 

control. In the event of any such delay, performance will be postponed by such length of time as may be reasonably 
necessary to compensate for the delay. 
 

Installation.

  If  Buyer  purchases  any  Goods  that  require  installation,  Buyer  shall,  at  its  expense,  make  all 

arrangements  and  connections  necessary  to  install  and  operate  the  Goods.  Buyer  shall  install  the  Goods  in 
accordance  with  any  Seller  instructions  and  shall  indemnify  Seller  against  any  and  all  damages,  demands,  suits, 

causes of action, claims and expenses (including actual attorneys’ fees and costs) arising directly or indirectly out 

of Buyer’s failure to properly install the Goods. 
 

Work  By  Others;  Safety  Devices.

  Unless  agreed  to  in  writing  by  Seller,  Seller  has  no  responsibility  for  labor  or 

work performed by Buyer or others, of any nature, relating to design, manufacture, fabrication, use, installation or 
provision of Goods. Buyer is solely responsible for furnishing and requiring its employees and customers to use all 
safety devices, guards and safe operating procedures required by law and/or as set forth in manuals and instruction 
sheets  furnished  by  Seller.  Buyer  is  responsible  for  consulting  all  operator  manuals,  ANSI  or  comparable  safety 
standards,  OSHA  regulations  and  other  sources  of  safety  standards  and  regulations  applicable  to  the  use  and 
operation of the Goods. 
 

Remedies.

  Each  of  the  rights  and  remedies  of  Seller  under  this  Agreement  is  cumulative  and  in  addition  to  any 

other or further remedies provided under this Agreement or at law or equity. 
 

Attorney’s  Fees.

  In  the  event  legal  action  is  necessary  to  recover  monies  due  from  Buyer  or  to  enforce  any 

provision  of  this  Agreement,  Buyer  shall  be  liable  to  Seller  for  all  costs  and  expenses  associated  therewith, 

including Seller’s actual attorney fees and costs. 
 

Governing  Law/Venue.

  This  Agreement  shall  be  construed  and  governed  under  the  laws  of  the  State  of 

Wisconsin, without application of conflict of law principles. Each party agrees that all actions or proceedings arising 
out of or in connection with this Agreement shall be commenced, tried, and litigated only in the state courts sitting in 
Manitowoc  County,  Wisconsin  or  the  U.S.  Federal  Court  for  the  Eastern  District  of  Wisconsin.  Each  party  waives 

any right it may have to assert the doctrine of “forum non conveniens” or to object to venue to the extent that any 
proceeding  is  brought  in  accordance  with  this  section.  Each  party  consents  to  and  waives  any  objection  to  the 
exercise of personal jurisdiction  over it by courts  described in this section. Each  party waives to the fullest  extent 
permitted by applicable law the right to a trial by jury. 
 

Summary of Return Policy. 

  10  Day  acceptance  period  from  date  of  delivery.  Damage  claims  and  order  discrepancies  will  not  be  accepted 

after this time. 

  You must obtain a Baileigh issued RGA number PRIOR to returning any materials. 

  Returned materials must be received at Baileigh in new condition and in original packaging. 

  Altered items are not eligible for return. 

  Buyer is responsible for all shipping charges. 

  A 30% re-stocking fee applies to all returns. 

 
Baileigh  Industrial  Holdings  LLC  makes  every  effort  to  ensure  that  our  posted  specifications,  images,  pricing  and 
product  availability  are  as  correct  and  timely  as  possible.  We  apologize  for  any  discrepancies  that  may  occur. 
Baileigh Industrial Holdings LLC reserves the right to make any and all changes deemed necessary in the course of 
business including but not limited to pricing, product specifications, quantities, and product availability. 
 

For Customer Service & Technical Support: 

Please contact one of our knowledgeable Sales and Service team members at: 
(920) 684-4990 or e-mail us at [email protected] 

Содержание DP-1375VS-110

Страница 1: ...AL HOLDINGS LLC IS PROHIBITED Baileigh Industrial Holdings LLC Inc does not assume and hereby disclaims any liability for any damage or loss caused by an omission or error in this Operator s Manual re...

Страница 2: ...Machine Head 21 Adjusting the Gear Rack Height 22 ELECTRICAL 23 OPERATION 25 Drilling 25 Tapping 26 Removing Tooling from Spindle 26 DRILLING RECOMMENDATIONS 27 LUBRICATION AND MAINTENANCE 29 Greasing...

Страница 3: ...n notice to Seller of any suspected defect in the Goods prior to the expiration of the warranty period The original end user must also obtain a RGA from Seller prior to returning any Goods to Seller f...

Страница 4: ...emedies provided under this Agreement or at law or equity Attorney s Fees In the event legal action is necessary to recover monies due from Buyer or to enforce any provision of this Agreement Buyer sh...

Страница 5: ...Description of the functional parts of the machine Capacity charts Setup and start up instructions Machine operation Scheduled maintenance Parts lists GENERAL NOTES After receiving your equipment remo...

Страница 6: ...zardous situation which if not avoided will result in death or serious injury WARNING Indicates a hazardous situation which if not avoided could result in death or serious injury CAUTION Indicates a h...

Страница 7: ...ud noises BEWARE OF PIERCING POINTS AND CUTTING HAZARD NEVER place hands fingers or any part of your body on or near rotating tooling This tooling can be extremely dangerous if you do not follow prope...

Страница 8: ...P BUTTON In the event of incorrect operation or dangerous conditions the machine can be stopped immediately by pressing the E STOP button Twist the emergency stop button clockwise cw to reset Note Res...

Страница 9: ...igh does not recommend or endorse making any modifications or alterations to a Baileigh machine Modifications or alterations to a machine may pose a substantial risk of injury to the operator or other...

Страница 10: ...chine 13 Stay alert Watch what you are doing and use common sense DO NOT operate any tool or machine when you are tired 14 Check for damaged parts Before using any tool or machine carefully check any...

Страница 11: ...comes to a complete stop Hold the piece part firmly against the table DO NOT attempt to drill a piece part that does not have a flat surface against the table or that is not secured by a vise Prevent...

Страница 12: ...ron 1 5 38 1mm Drilling Capacity Mild Steel 1 375 34 9mm Tapping Capacity Cast Iron 875 22 2mm Tapping Capacity Mild Steel 75 19 05mm Spindle To Table Maximum Distance 30 25 768 3mm Spindle To Base Ma...

Страница 13: ...ipping Weight 781lb 355kg TECHNICAL SUPPORT Our technical support department can be reached at 920 684 4990 and asking for the support desk for purchased machines Tech Support handles questions on mac...

Страница 14: ...age painted surfaces Follow manufacturer s label instructions when using any type of cleaning product After cleaning wipe unpainted metal surfaces with a light coating of quality oil or grease for pro...

Страница 15: ...oor Level the machine so that all the supporting feet are taking the weight of the machine and no rocking is taking place Follow these guidelines when lifting crane or hoist Always lift and carry the...

Страница 16: ...ell illuminated with proper lighting Keep the floor free of oil and make sure it is not slippery Remove scrap and waste materials regularly and make sure the work area is free from obstructing objects...

Страница 17: ...es if installing new circuits and or outlets Anchoring the Machine Once positioned anchor the machine to the floor as shown in the diagram Use bolts and expansion plugs or sunken tie rods that connect...

Страница 18: ...16 16 OVERALL DIMENSIONS 71 37 1813 26 50 673 38 30 973...

Страница 19: ...17 17 GETTING TO KNOW YOUR MACHINE F L Q M J H E N I O D P A A R C S K G B...

Страница 20: ...Scale Use for setting the depth stop approximate dimension J Control Panel Houses the operator s controls K Motor Provides power to the chuck L Electrical Enclosure Houses the electrical components M...

Страница 21: ...houses the coolant reservoir and supports the coolant pump The coolant is pumped up to a nozzle where a valve controls the flow onto the tool The coolant lubricant enters the table drain and flows ba...

Страница 22: ...tion for tapping only AE Drilling Tapping Selector Switch Selects the mode of operation drilling or tapping AF Stop Button Stops the spindle motor AG Start Button Starts the spindle motor A 10 second...

Страница 23: ...kwise cw will raise the head 6 STOP when the top of the machine head is flush with the top of the column DO NOT allow the column to be below the top of the head 7 Using the wrench lightly tighten the...

Страница 24: ...ockwise cw 2 Unlock column bearing B by loosening the two setscrews 3 Raise the gear rack C by turning crankshaft D counterclockwise ccw 4 Lock column bearing B by tightening the two setscrews 5 After...

Страница 25: ...indicated on the machine All line connections should make good contact Running on low voltage will damage the motor In the event of a malfunction or breakdown grounding provides a path of least resist...

Страница 26: ...ed below LENGTH AMP RATING 25ft 50ft 100ft 1 12 16 16 14 13 16 14 12 12 17 20 12 12 10 21 30 10 10 No WIRE GAUGE An undersized cord decreases line voltage causing loss of power and overheating All cor...

Страница 27: ...on the scale with indicator D 9 Re tighten lock knob B 10 Start machine by pressing start button E 11 Turn on the coolant selector switch F 12 Begin drilling using the down feed handles to lower the c...

Страница 28: ...lock knob B 10 Start machine by pressing start button E 11 Turn on the coolant selector switch F 12 Begin tapping using the down feed handles E to lower the chuck When the tap reaches the bottom of t...

Страница 29: ...rilling machine Desired quality of hole Difficulty of set up Drilling Feed The feed of a drill is governed by size of tool and the material drilled Because feed rate partially determines rate of produ...

Страница 30: ...n 70 100 Soft Cast Iron 100 150 Malleable Iron 80 90 High Nickel Steel or Monel 40 50 High Tensile Bronze 70 150 Ordinary Brass and Bronze 200 300 Aluminum and its Alloys 200 300 Magnesium and its All...

Страница 31: ...eekly basis clean the machine and the area around it Lubricate threaded components and sliding devices Apply rust inhibitive lubricant to all non painted surfaces Clean and grease the sliding surfaces...

Страница 32: ...with coolant solution The coolant system should be filled with 2 gallons of a cutting coolant Fill by pouring coolant into base of machine Add coolant in the same manner when coolant is low Follow all...

Страница 33: ...31 31 HEAD and CHUCK GUARD PARTS DIAGRAM...

Страница 34: ...VS A16 Quill Support Pin 1 26 DP 1375VS A26 Hex Socket Cap Screw M6 x 20 2 27 DP 1375VS A27 Plate 1 28 DP 1375VS A28 Nut M6 2 29 DP 1375VS A29 Spring with Cover 1 30 DP 1375VS A30 Screw 3 16 x3 8 3 31...

Страница 35: ...P 1375VS A58 Set Screw 1 4 x1 4 4 59 DP 1375VS A59 Screw 3 16 x 5 16 4 60 DP 1375VS A60 Depth Scale Bracket 1 61 DP 1375VS A61 Set Screw 3 16 x1 2 2 62 DP 1375VS A62 Key 6x20 1 63 DP 1375VS A63 Pinion...

Страница 36: ...1375VS G06 C Clip S 30 1 G7 DP 1375VS G07 Bracket 1 G8 DP 1375VS G08 Safety Guard 1 G9 DP 1375VS G09 Lower Bracket Bar 1 G10 DP 1375VS G10 Hex Socket Cap Screw M8X12 2 G11 DP 1375VS G11 Support Arm 1...

Страница 37: ...35 35 UPPER HEAD PARTS DIAGRAM...

Страница 38: ...Emergency Stop Switch 1 15 DP 1375VS B15 Start Switch 1 16 DP 1375VS B16 Selection Switch D T 1 17 DP 1375VS B17 Reversal Switch 1 18 DP 1375VS B18 Speed Control Knob 1 19 DP 1375VS B19 Pump Switch 1...

Страница 39: ...375VS B39 Inverter 1 40 DP 1375VS B40 Fuse 4 41 DP 1375VS B41 Relay 3 42 DP 1375VS B42 Contactor 1 43 DP 1375VS B43 Terminal Plate 1 44 DP 1375VS B44 Power Cable 1 45 DP 1375VS B45 Pump Power Cable 1...

Страница 40: ...38 38 COLUMN TABLE BASE PARTS DIAGRAM...

Страница 41: ...P 1375VS C9 1 Screw M4x50 1 9 2 DP 1375VS C9 2 Spring Washer 3 16 2 9 3 DP 1375VS C9 3 Nut M4 1 10 DP 1375VS C10 Crank Shaft 1 11 DP 1375VS C11 Spring Pin 4x25 1 12 DP 1375VS C12 Connection Rod Tread...

Страница 42: ...k 5x20 1 37 DP 1375VS C37 Table 1 37 1 DP 1375VS C37 1 Hose Coupler 1 38 DP 1375VS C38 Column 1 2 1 39 DP 1375VS C39 Handle 1 41 DP 1375VS C41 Clamping 1 42 DP 1375VS C42 Cross Cap Screw 1 43 DP 1375V...

Страница 43: ...41 41 ELECTRICAL COMPONENTS KM1 KM2 F3 F4 KR RX F1 F2...

Страница 44: ...Open for Drilling SA2 Coolant Pump On Off Selector Switch KR Tapping Relay RX Power ON Relay VR Variable Speed Potentiometer QS1 Safety Guard Limit Switch QS2 Spindle Lower Reversing Limit Switch Tapp...

Страница 45: ...43 43 ELECTRICAL SCHEMATIC...

Страница 46: ...cutting fluid Reduce feed pressure or use cutting fluid Use correct cutting fluid Poorly drilled holes Drill dull Sharpen drill Lack of rigidity in hold down method Check that all T slot hold downs ar...

Страница 47: ...id Use correct cutting fluid for the material and drill Table cannot be raised Lack of lubrication Lubricate No speed readout Speed pickup out of adjustment or failed Adjust gap between speed pickup a...

Страница 48: ...TOWOC WI 54220 PHONE 920 684 4990 FAX 920 684 3944 www baileigh com BAILEIGH INDUSTRIAL HOLDINGS LTD UNIT D SWIFT POINT SWIFT VALLEY INDUSTRIAL ESTATE RUGBY WEST MIDLANDS CV21 1QH UNITED KINGDOM PHONE...

Отзывы: