pBS2120 Base Station Installation Guide
5
2. Out-of-Box Audit
Before opening the box, make sure the package is in good condition, undamaged and
not wet. During the unpacking, avoid potential damaging impacts from hits or excessive
force. Once unpacked, check the contents to see if they are consistent with that in the
shipping list shown in Table 2-1.
Table 2-1 Shipping List
No.
Item
Quantity
Description
1
pBS2120 base station
1
Check whether the base station
’s tag
is consistent with the requirement
2
Base station mounting
bracket
1
Fixed with base station
3
Integrated bracket for on
pole or on wall
1
Used for fix on pole or on wall
4
U shape clamp
1
Used for fix on pole
5
Omega
Used for fix on pole
6
Screw package
1
M6*12 combined screw * 8
M8 hex nut * 2
7
PoE power adaptor
1
-
8
Power cable
1
The length is 1m.
9
Ground terminal
1
Used for making ground cable.
10
Warranty
1
-
11
Certification
1
-
12
User guide
1
-
Note:
During the unpacking, if the outer package is damaged or wet, stop unpacking and find the cause.
Report the issue to the vendor. For any shortage or damage that is identified, report the local vendor
within 10 days.