Disassembly of the BADU Mat
6 EN
01|2019
5
Disassembly of the BADU Mat
1. Switch the pump off.
2. If required, close the ball valves in the pipes and drain the
system slightly.
3. Knock the cylinder pin out of the hand lever.
4. Remove the washer and store it in a safe place.
5. Release the 6 or 10 screws on the lid and remove the lid.
6. Remove the insert with the spring.
7. Clean the valve, if necessary renew the O-ring in the insert.
6
Assembly of the BADU Mat
1. Assembly is carried out in reverse order.
2. Ensure that a new O-ring is placed under the lid. Grease all
O-rings!
3. The position markings on the lid and housing must sit above
each other.
4. Tighten the screws evenly in a crosswise sequence.
Содержание Mat R 41
Страница 2: ...Inhaltsverzeichnis DE Originalbetriebsanleitung EN Translation of original operation manual ...
Страница 9: ...Technische Daten 01 2019 DE 7 7 Technische Daten 7 1 Durchflusskennlinie Abb 1 ...
Страница 10: ...Technische Daten 8 DE 01 2019 7 2 Maßzeichnung Abb 2 ...
Страница 11: ...Technische Daten 01 2019 DE 9 Abb 3 ...
Страница 12: ......
Страница 19: ...Technical data 01 2019 EN 7 7 Technical data 7 1 Flow characteristics Fig 1 ...
Страница 20: ...Technical data 8 EN 01 2019 7 2 Dimensional drawing Fig 2 ...
Страница 21: ...Technical data 01 2019 EN 9 Fig 3 ...
Страница 22: ......
Страница 23: ......
Страница 24: ...VG 766 2610 051 2 RE BA 01 2019 ...