Installation and operation manual
•
Version RCM-10/03-e
Scope
Page 2/18
2. Scope
This manual contains information concerning the installation, operation and maintenance
of the RCM-2000. To ensure proper performance of the unit, the instructions should be
thoroughly understood and followed.
Keep the manual in a readily accessible location for future reference.
Changes and additions to the original edition of this manual will be covered by a
“CHANGE NOTICE” supplied with the manual. The change notice will identify the
sections in this manual where the changes have occurred.
3. Unpacking & inspection
1. If damage to the shipping container is evident upon receipt, request the carrier to be
present when the product is unpacked.
2. If damage is found, request an inspection by the carrier’s agent within 48 hours of
delivery and file a claim with the carrier.
A claim for equipment damage in transit
is the sole responsibility of the customer.
3. Retain the container and all packing material for possible use in reshipment or
storage.
4. System diagram
Programmable
amplifier
Level
translator
IS
barrier
P3
P1
P2
A/D
Integrator
Buffer
Microcontroller
Programmable
coil driver
Detector
coil
LCD
Backlight
AC/DC supply
DC
regulator(s)
Key input
Comm
Control
logic
Empty pipe