background image

60

LIMITED CONDITIONAL WARRANTY*
Backyard Storage Solutions, LLC warrants the following:
1.

Every product is warranted from defects in workmanship and manufacturing for 1 year.

2.

All accessories, hardware and metal components are warranted for 2 years.

3.

LP Prostruct® Flooring is warranted for 10 years

4.

All Oriented Strand Board (OSB) is warranted for 2 years

5.

Siding and Trim is warranted for 15 years.

6.

Solar Shed windows are warranted for 1 year.

7.

Cedar lumber is warranted for 15 years.

8.

Preserved Pine is warranted for 10 years.

Backyard Storage Solutions, LLC will repair, replace or pay for the affected part.  In no event shall Backyard Storage Solutions, LLC 
pay the cost of labor or installation or any other costs related thereto.  All warranties are from date of purchase.  If a cash refund is paid 
on an affected part, it will be prorated from the date of purchase.

CONDITIONS
The warranty is effective only when:
1.

The unit has been erected in accordance with the assembly instructions.

2.

The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter.

3.

The failure occurs when the unit is owned by the original purchaser.

4.

Backyard Storage Solutions, LLC has received the warranty registration card within thirty (30) days of purchase and
notification of the failure in writing within the warranty period specified above.

5.

Backyard Storage Solutions, LLC has had reasonable opportunity during the sixty (60) days following receipt of notification to
inspect and verify the failure prior to commencement of any repair work.

REQUIREMENTS
Storage Buildings
To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or 
solid-colored stain the siding using quality, 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of 
assembly; caulk above all doors and all horizontal and vertical trim boards; paint and seal all exposed edges, sides and faces of 
siding/trim and OSB siding to include all exterior walls and all sides and all edges of doors.  

Gazebos & Pergolas
To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit.  This includes treating all of 
the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative, an exterior 
oil-based semi-transparent stain, an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly 
and as needed thereafter to maintain your warranty.

Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement.  
The minimum ground clearance for siding must be one half inch (½ inch) from concrete slab or two and one half inches (2 ½”) from the 
ground when building is erected or constructed on a treated wood floor kit. Water from sprinklers must be kept off unit. In no event will 
Backyard Storage Solutions, LLC be responsible for any indirect, incidental, consequential or special damages nor for failure(s) that 
are caused by events, acts or omissions beyond our control including, but not limited to, misuse or improper assembly, improper 
maintenance (which eventually leads to rot or decay) and acts of God. Backyard Storage Solutions, LLC will not be held responsible for 
any labor costs incurred to construct your unit.
This warranty gives you certain specific rights that vary from state to state.

CLAIM PROCEDURE
To make a claim under this warranty, you can either call 1-888-827-9056 or email: [email protected].  
Please have ready the information below when you call or include the information in your email:
1.

The model and size of the product.

2.

A list of the part(s) for which the claim is made.

3.

Proof of purchase of the Backyard Storage Solutions, LLC item, as shown on the original invoice.

4.

Run code: found on exterior product label or assembly instructions enclosed in the product package.

All other inquiries can be mailed to:

Backyard Storage Solutions, LLC
Attn: Customer Service
1000 Ternes
Monroe, MI 48162

*WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A.

IMPORTANT:  This is your warranty certificate.

YDL LDR: 07/27/2016

WARRANTY REGISTRATION
Please complete your warranty registration to properly validate your warranty.
Register your product online at:www.OnlineWarranty.net.

Содержание YardLine ASTON

Страница 1: ...o pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 7 CHECK ALL PARTS...

Страница 2: ...r installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best sur...

Страница 3: ...Lbs For shingles PAINT FOR TRIM 1 Quart Use 100 acrylic latex exterior paint WOOD GLUE Exterior Rated REINFORCED WOOD FLOOR FRAME OPTIONAL IMPORTANT The included floor has been designed for general us...

Страница 4: ...82 8 cm x1 1 x 3 x 5 2 5 x 7 6 x 12 7 cm TRIM x2 19 32 x 3 1 2 x 48 1 5 x 8 8 x 121 9 cm x1 19 32 x 3 1 2 x 52 3 8 1 5 x 8 8 x 133 cm x2 2 x 3 x 33 1 8 5 1 x 7 6 x 84 1 cm x1 x4 19 32 x 2 1 2 x 9 1 5...

Страница 5: ...4 4 cm x2 3 8 x 2 x 68 3 4 0 9 x 5 1 x 174 6 cm x1 3 8 x 2 x 69 1 4 0 9 x 5 1 x 175 8 cm x1 3 8 x 2 x 69 1 4 0 9 x 5 1 x 175 8 cm x2 3 8 x 2 x 91 1 4 0 9 x 5 1 x 231 7 cm x1 3 8 x 2 x 93 1 4 0 9 x 5 1...

Страница 6: ...x 106 6x 211 1 cm x1 3 8 x 48 x 96 1 x 121 9x 243 8 cm x1 3 8 x 48 x 96 1 x 121 9x 243 8 cm x1 3 8 x 42 x 83 1 8 1 x 106 6x 211 1 cm x1 3 8 x 23 7 8 x 72 1 x 60 6 x 182 9 cm x1 3 8 x 48 x 96 1 x 121...

Страница 7: ...ng in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL REQUIRED x2 4 x 4 x 10 10 x 1...

Страница 8: ...ll plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to...

Страница 9: ...r nailing stand on frame 2 1 Use two 3 nails at each mark Orient parts as shown on flat surface Measure and mark BEGIN You have finished your floor frame Proceed to level and square frame FINISH 3 Not...

Страница 10: ...diagonal measurement will be approximately 150 381 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end...

Страница 11: ...oor frame is square by installing one panel and squaring frame Fig A Fig B Check the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor...

Страница 12: ...g your floor panels Continue installing panels with rough side up painted grid lines Use grid lines on panel for 2 nails 6 apart on edges and 12 apart inside panels 5 7 6 x1 x1 x91 5 8 x 23 7 8 x 90 1...

Страница 13: ...rame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the build...

Страница 14: ...1 1 2 3 8 cm 48 121 9 cm HINT For easier nailing stand on frame x2 2 x 4 x 72 5 1 x 10 2 x 182 9 cm TM x6 2 x 4 x 64 5 1 x 10 2 x 162 5 cm UX x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x28 14 3 7 6 cm D...

Страница 15: ...primed side up as shown Use the gauge block to mark the 3 4 measurement on the wall stud Secure panel with two 2 nails in the corners Fig A Nail the panel using 2 nails 6 apart on edges and 12 apart...

Страница 16: ...Nail using 2 nails 6 apart on edges and 12 apart inside panel 6 Place end 23 7 8 x 72 panel on frame as shown with primed side facing up Nail using 2 nails 6 apart on edges and 12 apart inside panel...

Страница 17: ...2 cm x2 RR 2 x 4 x 16 1 2 5 1 x 10 2 x 42 cm x1 RD x34 3 7 6 cm D O O R BEGIN 1 Use two 3 nails at each mark and four 3 nails at seams For front wall orient parts on edge on floor Measure and mark 2...

Страница 18: ...QUIRED HINT For easier nailing stand on frame 2 x 4 x 16 5 1 x 10 2 x 42 cm x3 RD x12 3 7 6 cm Use two 3 nails at each mark Orient parts on edge as shown Measure and mark 3 4 27 1 2 69 9 cm 64 162 6 c...

Страница 19: ...64 162 5 cm measurement between studs and square frame 2 1 MAINTAIN 64 DIMENSION BETWEEN STUDS Handle panels with care to avoid breakage Hold the 3 4 measurement along left edge of panel Use a gauge...

Страница 20: ...wall frame flush to left panel Nail panel with two 2 nails 6 15 2 cm apart Maintain 64 162 5 cm measurement between studs and square frame 4 5 3 Use OO as a brace to maintain 64 162 6 cm opening Use t...

Страница 21: ...STUDS Repeat steps 6 and 7 to attach the right panel 8 10 Place 11 7 8 x 96 panel onto wall frame flush to left 48 x 96 panel with primed side up as shown Ensure top of panel is overhanging the top o...

Страница 22: ...side wall bottom plate to floor using 3 nails Fig A 3 3 7 6 cm x10 x22 BACK WALL INSTALLATION D O O R 3 Nails into bottom plate BEGIN Stand backwall on floor It is important to secure the backwall in...

Страница 23: ...front wall bottom plates to floor using 8 3 nails Fig A 4 x8 x4 x10 FRONT WALL INSTALLATION D O O R 3 7 6 cm Screws x4 BOA x2 3 Nails into bottom plate BEGIN Stand front wall on floor Center front wa...

Страница 24: ...45 5 8 5 1 x 10 2 x 115 8 cm 2 x 4 x 48 5 1 x 10 2 x 122 cm BMA SP TM BNA TM SP 3 7 6 cm Nails Stagger seams 3 7 6 cm Nails Flush Flush Flush Flush Flush Flush BMA BNA Stagger seams BEGIN 1 2 3 Use tw...

Страница 25: ...uter rafter using 3 screw installed centered into outer rafter end Fig A and afterwards toenailed into inside of rafter Fig B Secure front of outer rafter using 3 screws installed centered into outer...

Страница 26: ...ews Fig B Fig D Repeat steps 2 through 5 to install 6 remaining rafters Line up rafter centered with marks on front doubler Ensure rafter is flush to front wall panel Fig C and resting flush on top of...

Страница 27: ...rafter extension above top of front wall panels Fig B Use another rafter extension BRA as a guide to line up rafter extension with top of main rafter Fig A Repeat steps 1 and 2 to install remaining 8...

Страница 28: ...length Fig B Angle nails to hit floor frame Fig C Place 42 x 83 panel onto side wall flush with bottom of 48 x 96 panel with primed side up as shown Secure panel with 2 nails in three corners Fig E E...

Страница 29: ...2 cm 6 15 2 cm 6 15 2 cm x45 1 1 2 3 2 cm 5 Nail lower edge of panel to floor using 2 nails 6 apart Angle nail to hit floor frame Fig A Nail side wall panels to rafter and wall studs using 1 1 2 nails...

Страница 30: ...wall panels BKA BJA BFA 3 7 6 cm Screw D O O R MARK BEGIN Install BJA centered at seam of side wall panels Fig A Use a square to ensure 90 degree squareness of studs BKA BFA and BJA Mark locations of...

Страница 31: ...hed nailing your SIDE WALL PANELS FINISH 11 Nail side wall panels to inside wall studs using 1 1 2 nails 6 apart along panel seam and 12 apart in middle of panels as shown Measure align and mark side...

Страница 32: ...ters 2 You must square the roof by attaching one panel first You will use the panels long edge as a lever to bring your roof into square Commonly known as racking Roof panels may cause serious injury...

Страница 33: ...apart on edge and 12 apart inside panel Locate the second 48 x 96 roof panel with the rough side up flush to first panel along edge and at both corners Fig C D Repeat nailing pattern Nail the 36 3 8 x...

Страница 34: ...ach rafter extension 90 degrees square with roof rafters as shown Secure rafter extensions with screws through roof panels Fig A At roof panel seams use 4 screws Fig B 7 D O O R FINISH 8 Fig B Fig A S...

Страница 35: ...IRED GABLE RAKE FRAMING 1 Align BPA edge flush with BRA Fig A Attach with 3 2 nails Fig B BEGIN HJ BPA BRA 2 3 4 Attach HJ flush with BPA with 5 2 nails Fig A B Repeat Steps 1 2 on opposite side You h...

Страница 36: ...eave trim Attach BUA to BRA Fig A C Extend approximately 1 4 beyond roof panel Fig B Secure BUA with 2 finish nails Fig C BEGIN 1 Attach BTA to BRA Fig A C flush with BUA Secure with 2 finish nails B...

Страница 37: ...ZT Fig A Fig B Fig C PARTS REQUIRED x28 2 5 1 cm x2 19 32 x 3 1 2 x 48 1 5 x 8 8 x 121 9 cm x2 2 x 3 x 33 1 8 5 1 x 7 6 x 84 1 cm BQA x2 ZT x1 x1 19 32 x 3 1 2 x 59 1 4 1 5 x 8 8 x 150 4 cm 19 32 x 3...

Страница 38: ...a trim FINISH 5 Make sure there is a 5 1 4 space as shown Fig C 4 Repeat steps 1 3 on opposite side 3 Nail front fascia to side fascia with 2 2 finished nails Fig D 5 1 4 13 3 cm Fig C 2 Screws Attach...

Страница 39: ...2 5 1 cm 2 5 1 cm 3 7 6 cm BYA or ZX 2 Nails ZT Place PT and FS flush to roof sheathing and to ZT Fig B C BEGIN 1 Attach PT and FS with 2 wood screws through roof sheathing and 1 3 screw at OY on both...

Страница 40: ...h 35 3 4 soffit board under BRA using 6 2 finish nails as shown primed side down Fig A B Align 95 3 8 soffit board flush with 35 3 4 Attach soffit board with 14 2 finished nails underneath BRA Fig D F...

Страница 41: ...1 cm SOFFIT continued Attach 95 1 2 soffit board under fascia backer and side rake framing Fig C D using 14 2 nails Repeat Step 3 on opposite side 4 3 You have finished installing your soffit panels...

Страница 42: ...and at ends as shown Tighten securely Attach temporary support GAA with two 1 1 4 screws as shown Tighten securely HINT Look for 3 8 SPACER attached to doors OO GAA Make sure spacer is attached Tight...

Страница 43: ...talling your doors Attach temporary support OO as a ledger board flush under wall panels for doors to rest on using 3 screws Fig A Screw hinge boards into wall frame and floor using ten 3 screws as sh...

Страница 44: ...h door panel into trim Fig A Locate screws as shown in Fig B Use two screws at seams Place AH 9 from top and lower cross brace and level Fig B Secure from behind using three 3 4 screws Repeat step 1 2...

Страница 45: ...x 7 6 x 175 3 cm x2 x10 2 5 1 cm DOOR WEATHERSTRIP OO FINISH 5 On right door center OO vertically in door opening Fig A OO will offset the right door 1 IN from the door trim Fig C 3 Secure OO using f...

Страница 46: ...s open when loop is contacting base Fig A Mark and pre drill holes for screws Mark and pre drill holes for screws 1 LEFT DOOR Fig B PARTS REQUIRED DOOR x2 x8 5 16 0 8 cm Drill Bit You have finished in...

Страница 47: ...3 8 cm screws 2 35 3 4 90 cm RIGHT DOOR 1 1 2 3 8 cm TOP VIEW 1 4 Pre drill and 1 2 Drill through DOOR HARDWARE x1 x2 PARTS REQUIRED 1 1 2 3 8 cm Re drill hole with 1 2 drill Keep drilled hole square...

Страница 48: ...d level Use two screws at top of windows Do not fully tighten screws 2 HINT Caulk behind frame near edge before installing Approximately 1 2 5 cm 2 Screws per window You must caulk around windows to v...

Страница 49: ...n Position EY at ends and in between window frame as shown Secure using 8 2 finish nails Remove 1 1 4 screws Position BSA centered on window frame as shown Secure using 4 2 finish nails x4 19 32 x 2 1...

Страница 50: ...cm 6 You have finished installing your window FINISH 7 Install 12 3 4 screws from inside as shown Do not screw into window flange FRAMING BEYOND INSIDE OF SHED Install 3 4 1 9 cm screws from inside I...

Страница 51: ...r back corner trim 4 Repeat for other side 3 2 FINISH Fig C 68 3 4 174 6 cm 69 1 4 175 8 cm Angled End up Place 69 1 4 back side corner trim angled end up Fig E flush up under side soffit panel and fl...

Страница 52: ...GIN 1 Attach 25 3 8 64 4 cm and 96 243 8 cm front horizontal frieze boards using 2 finish nails as shown Fig A Leave 3 8 0 95 cm overhang on both ends Fig B FRONT FRIEZE TRIM FINISH You have finished...

Страница 53: ...RED x12 2 5 1 cm FRONT CORNER TRIM Attach both vertical 91 1 4 231 7 cm front corner trim on both sides flush to bottom edge of previously installed horizontal frieze trim using 6 2 nails per trim Fig...

Страница 54: ...REQUIRED x12 2 5 1 cm FRONT SIDE TRIM FINISH You have finished attaching your front side trim boards 2 Attach 93 1 4 236 8 cm front side corner trims on both sides flush with front frieze trim Use 6...

Страница 55: ...at top and 1 at bottom Cut out marked openings Caulk behind vent flanges Secure using 1 2 1 3 cm screws You have finished installing your vents x12 1 2 1 3 cm x2 VENTS 8 x 16 20 3 x 35 6 cm 6 15 2 cm...

Страница 56: ...ovided by manufacturer Follow directions provided by manufacturer You must install drip edge to validate warranty PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED Install felt fl...

Страница 57: ...nstall first starter row upside down color up and flush to drip edge at bottom of roof panel Use 4 nails per shingle Starter row must be straight and level all the way across with lower edge of roof d...

Страница 58: ...shed make sure there is a maximum of 5 or less to the rain slot as shown below If shingles overlap at front roof edge cut to roof edge with a utility knife 1 2 5 cm 5 12 7 cm 5 12 7 cm or less BACK OF...

Страница 59: ...with 1 overhang over roof edge Align remaining shingles with edge of the front drip edge Using your shingle hooked blade carefully cut shingles on a flat surface along the rain slots using a chalk lin...

Страница 60: ...dges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces...

Отзывы: