33
7/16 x 48 x 96"
(1,1 x 121,9 x 244 cm)
48 x 96"
(121,9 x 244 cm)
7/16 x 36-3/8 x 96"
(1,1 x 92,4 x 244 cm)
7/16 x 11-7/8 x 96"
(1,1 x 30,2 x 244 cm)
11-7/8 x 96"
(30,2 x 244 cm)
x1
x1
x1
x120
ROOF PANELS
PARTS REQUIRED:
2" (5,1 cm)
36-3/8 x 96"
(92,4 x 244 cm)
1/2"
(1,3 cm)
Fig. B
DOOR
Flush
7/16 x 11-7/8
x
36-3/8
(1,1 x
30,2
x
92,4
cm)
11-7/8 x 36-3/8"
(30,2 x 92,4 cm)
x1
12"
(30,5 cm)
12"
(30,5 cm)
12"
(30,5 cm)
6"
(15,2 cm)
6"
(15,2 cm)
6"
(15,2 cm)
6"
(15,2 cm)
6"
(15,2 cm)
Flush
Flush
Flush
Flush
Fig. D
Flush
Fig. E
Flush
Flush
Flush
DOOR
DOOR
Nail the first
48 x 96"
roof panel using 2" nails 6" apart on edge and 12" apart inside panel.
Locate the second
48 x 96"
roof panel with the rough side up flush to first panel along edge
and at both corners
(Fig. C, D)
. Repeat nailing pattern.
Nail the
36-3/8 x 96"
roof panel with the rough
side up using 2" nails 6" apart on edge and 12"
apart inside panel.
Ensure the
36-3/8 x 96"
roof panel is flush to
installed
48 x 96"
roof panels and overhang is
at 1/2"
(Fig. B, E)
.
Nail the
11-7/8 x 96"
roof panel with
the rough side up using 2" nails 6"
apart on edges.
Ensure the
11-7/8 x 96"
roof panel is
flush to installed
roof panels
(Fig. E)
.
Nail the
11-7/8 x 36-3/8"
roof panel
with the rough side up using 2" nails
6" apart on edges.
Ensure the
11-7/8 x 36-3/8"
roof
panel is flush to all (3) installed
roof
panels
(Fig. E)
.
3
4
5
6
Fig. C
Flush