30
Install angled purlin
TPC
flush to side
wall panels and flush across upper
back panel edge.
Ensure angled profile is correct
(Fig. A)
.
Secure
TPC
to vertical framing with
(2) 3" screws.
Predrill holes with 1/8" bit.
BEGIN
1
ROOF OVERHANG FRAMING
PARTS REQUIRED:
1-1/2"
(3,8 cm)
Nails
3" (7,6 cm)
x2
1-1/2" (3,8 cm)
x7
x1
2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)
TPC
Tapered Profile
Working inside, secure
TPC
with
1-1/2" nails spaced evenly.
2
Flush
Flush
Flush
Flush
TPC
Fig. A
Tapered Profile
Содержание MODERN 8' x 6'
Страница 2: ... This page intentionally left blank ...