48
7-1/4"
24-3/8"
42-1/2"
60-5/8"
79-3/4"
(18,4 cm)
(61,9 cm)
(108 cm)
(154 cm)
(202,6 cm)
ROOF PANELS
PARTS REQUIRED:
BEGIN
1
Install the first roof panel flush to
front edge of roof overhang trim
and flush to edge of right side trim
(Fig. B)
.
Measure and mark centers of all
purlins and upper wall framing.
Use Fig. A as a measuring guide.
Peel adhesive from (1) foam
enclosure strip and install
between roof panel and back
wall purlin.
Flush foam strip along inner
edge of trim.
Install (6) screws in the panel
valley nearest right edge
(Fig. B)
, and then with (12)
screws in each of the 3rd and
5th valleys, as shown.
Center screws in framing.
Predrill all holes.
BACK OF SHED
BACK OF SHED
Foam Enclosure
Strip
Measure from
edge of front trim.
1/8" BIT
(3 mm)
26" x 82-1/2" (66 x 209,6 cm)
x1
x1
Foam Strip
26" (66 cm)
2"
(5,1 cm)
Screws
Flush
Fig. A
Fig. B
Roof Panel
Valley
Flush
Flush
Flush
3rd
Valley
5th
Valley
x18
2" (5,1 cm)
2
CAUTION:
Do not stand or lean on roof panels.
Содержание MODERN 8' x 6'
Страница 2: ... This page intentionally left blank ...