22
FRONT WALL PANELS
2" (5,1 cm)
x47
PARTS REQUIRED:
Flush
Flush
1"
(2,5 cm)
6"
(15,2 cm)
3/4"
GAUGE
BLOCK
3/4"
(1,9 cm)
3/4"
(1,9 cm)
Install right
48" x 96"
panel on back wall frame. Begin at the bottom of panel.
Maintain 1" measurement at bottom edge of panel and 3/4" measurement along panel edges.
Secure panel with 2" nails spaced 6" apart along edges.
Install (1)
gable filler
panel centered at top of frame, flush to installed panels.
Secure panel with 2" nails spaced 6" apart along edge.
Install (1)
OO
as a temporary support to maintain he 64" measurement.
Secure
OO
with (2) 3" screws into door frame.
2
3
4
Angle nail to draw
panels tight at seams.
Flush
6-3/4" x 26-1/2"
x1
3/8" x 6-3/4" x 26-1/2"
(1,0 x 15,3 x 67,3 cm)
3" (7,6 cm)
x2
OO
x2
69" (75,3 cm) Door Stiffener
Temporary Support
3"
(7,6 cm)
Screws
64"
(162,6 cm)
OO Temporary Support
3/8 x 48 x 96"
(1 x 122 x 244 cm)
x1
Содержание Handy Home Products KENNESAW
Страница 2: ...This page intentionally left blank...