11
Move to the opposite side. Using the long edge of the panel as a lever, move the
panel side-to-side until the top corner is flush to the floor frame
(Fig. B)
.
Use
GAA
as a gauge block to maintain the 3/4" measurement on the left edge of floor joist.
Secure panel with (2) 2" nails in the corners.
Continue securing the panel with 2" nails spaced 6" apart on edges and 12" apart inside panel.
2
BEGIN
1
PARTS REQUIRED:
x62
2" (5,1 cm)
FLOOR PANELS
Install (1)
48" x 92-1/2"
panel with the 48" edge and corner flush to the floor frame
(Fig A)
.
Secure panel with (2) 2" nails in the corners.
Fig. B
(2)
Nails
(2)
Nails
3/4"
3/4"
Ensure your floor frame is square by installing one panel and squaring the frame.
Fig. A
Flush
Flush
Flush
3/4" GAUGE
BLOCK
3/4"
GAUGE
BLOCK
x1
5/8 x 48 x 92-1/2"
(1,6 x 121,9 x 235 cm)
48" x 92-1/2"
6"
(15,2 cm)
12"
(30,5 cm)
For squareness maintain 3/4"
measurement along panel edge.
BEGIN HERE
3/4"
(1,9 cm)
Flush
Flush
Install floor panels with the rough side facing up (painted grid lines).
Содержание Handy Home Products KENNESAW
Страница 2: ...This page intentionally left blank...