28
BACK GABLE UNIT and FRONT UPPER WALL
Your back gable unit has been installed and the front wall is secured to the front rafter.
FINISH
x74
1-1/2" (3,8 cm)
PARTS REQUIRED:
1
x2
3" (7,6 cm)
BEGIN
2
4
Continue nailing lower edge of panels into top plate with 2" nails spaced 6" apart.
Secure front wall gable panels to front rafter with 2" nails spaced 6" apart..
Working inside, secure gable unit with (2) 3" screws screwed into
BSN
at an angle
(Fig. A)
.
Continue securing panels to rafter with 2" nails spaced 6" apart.
3
Center back gable unit on top of Z-Channel.
Hold gable unit secure with (1) 2" nail on each side.
ENSURE GABLE IS CENTERED ON WALL BEFORE NAILING.
NAIL FIRST
2" (5,1 cm)
TOP PLATE
6"
(15,2 cm)
BSN
Fig. A
3" (7,6 cm)
Screws
NAIL FIRST
2" (5,1 cm)
6"
(15,2 cm)