21
FRONT WALL
2" (5,1 cm)
PARTS REQUIRED:
x34
2
2
3
x4
1-1/2" (3,8 cm)
Install panels with the primed side facing up.
OO
x2
69" Door Stiffener (175,3 cm)
Temporary Support
DT
1-1/2"
(3,8 cm)
Nails
1-1/2"
(3,8 cm)
Nails
2"
(2,5 cm)
Nails
3"
(7,6 cm)
Screw
3"
(7,6 cm)
Screw
1-1/4"
(3,2 cm)
1"
(2,5 cm)
1"
(2,5 cm)
1/2"
(12,7 mm)
1/2"
(12,7 mm)
1/2"
(12,7 mm)
1/2"
(12,7 mm)
Stack (3) gussets as
temporary supports.
Install (1) front wall panel
centered on frame and 1"
above upper door frame.
Maintain 1/2" along door stud
before nailing.
Secure the panel with 2" nails
spaced 6" apart along edges.
Secure panel to gable
connector (DT) with 1-1/2"
nails, as shown.
Install 2nd front wall panel flush
to installed panel at gable, and
1" above upper door frame.
Maintain 1/2" along door stud
before nailing.
Secure the panel with 2" nails
spaced 6" apart along edges.
Secure gable connector (DT)
with 1-1/2" nails, as shown.
Ensure 48" door opening by
installing
OO
as a temporary brace.
Secure with (2) 3" screws.
x1
x1
Flush
6"
(15,2 cm)
6"
(15,2 cm)
Flush
48"
(122 cm)
OO Temporary Support
3" (7,6 cm)
x2
FINISH
Your front wall is now assembled.