NOTE:
ENSURE PILOT HOLES ARE
CENTERED ON FLOOR JOISTS.
NOTE:
T-NUTS THESE HOLES
ON BOTTOM SIDE.
TIP:
INSTALL T-NUTS ON BOTTOM SIDE
OF BOTH Y1 FLOOR BOARDS
BEFORE ATTACHING TO FORT.
FORT ASSEMBLY
STEP 21
FLOOR PANEL - W2A03345
1 1/4"x13 1/2"x81 7/8" (32x344x2080)
FP2
(4)
TOP FLOOR BOARD - W4L15964
5/8"x4"x78" (16x102x1980)
Y1
(2)
SCREW PFH
8x1 1/2
(126)
H100086
T-NUT
5/16
(2)
H100074
074
(x2)
T-NUT - 5/16"
Y1
(x2)
086
(x126)
SCREW - 1 1/2"
074
(x2)
T-NUT - 5/16"
Y1
(x1)
Y1
(x1)
FP2
(x4)
FLOOR PANEL
81
Содержание SKYFORT II 6113D
Страница 12: ...Owner s Manual Tools Required for Installation 12...
Страница 111: ...REPEAT STEPS 49 50 TO ATTACH LEFT SIDE ROOF PANELS FORT ASSEMBLY STEP 51 111...
Страница 124: ...STEP 64 TELESCOPE 1 A6P00096 SCREW PFH 8x1 1 4 2 H100087 087 x2 SCREW 1 1 4 096 x1 TELESCOPE FORT ASSEMBLY 124...
Страница 129: ...STEP 4 FINAL ASSEMBLY SCREW PWH 8x5 8 2 H100128 128 x2 SCREW 5 8 314 x1 A REVISION TAG A REVISION TAG 1 A100314 129...