SWING BEAM
STEP 2
073
(x12)
T-NUT - 3/8"
102
(x12)
WASHER - 11x25"
107
(x12)
WASHER - 10x18"
654
(x12)
BOLT - 5-1/2"
505
(x6)
SWING HANGER
SWING HANGER
A4M00505
(6)
BOLT HEX
3/8x5-1/2
(12)
H100654
INSTALL T-NUTS INTO
BOARDS BEFORE ASSEMBLY.
TIP:
WASHER LOCK
INT
10x18
(12)
H100107
WASHER FLAT
11x25
(12)
H100102
T-NUT
3/8
(12)
H100073
53
Содержание SKYFORT II 6113D
Страница 12: ...Owner s Manual Tools Required for Installation 12...
Страница 111: ...REPEAT STEPS 49 50 TO ATTACH LEFT SIDE ROOF PANELS FORT ASSEMBLY STEP 51 111...
Страница 124: ...STEP 64 TELESCOPE 1 A6P00096 SCREW PFH 8x1 1 4 2 H100087 087 x2 SCREW 1 1 4 096 x1 TELESCOPE FORT ASSEMBLY 124...
Страница 129: ...STEP 4 FINAL ASSEMBLY SCREW PWH 8x5 8 2 H100128 128 x2 SCREW 5 8 314 x1 A REVISION TAG A REVISION TAG 1 A100314 129...