013
(x4)
BOLT - 2 1/4
028
(x4)
LAG SCREW - 2 1/2"
030
(x8)
WASHER - 8x19
074
(x4)
T-NUT - 5/16"
H31
(x1)
H30
(x1)
H31
(x1)
CROWS NEST WALL RAIL - W4L15907
1"x3 3/8"x38 7/8" (24x86x988)
H31
(2)
CROWS NEST WALL RAIL - W4L11782
1"x3 3/8"x29 7/8" (24x86x758)
H30
(1)
FORT ASSEMBLY
STEP 57
LAG SCREW WH
5/16x2 1/2
(4)
H100028
BOLT WH
5/16x2 1/4
(4)
H100013
T-NUT
5/16
(4)
H100074
WASHER LOCK
EXT
8x19
(8)
H100030
TIP:
INSTALL T-NUTS INTO
BOARDS BEFORE ASSEMBLY.
117
Содержание SKYFORT II 6113D
Страница 12: ...Owner s Manual Tools Required for Installation 12...
Страница 111: ...REPEAT STEPS 49 50 TO ATTACH LEFT SIDE ROOF PANELS FORT ASSEMBLY STEP 51 111...
Страница 124: ...STEP 64 TELESCOPE 1 A6P00096 SCREW PFH 8x1 1 4 2 H100087 087 x2 SCREW 1 1 4 096 x1 TELESCOPE FORT ASSEMBLY 124...
Страница 129: ...STEP 4 FINAL ASSEMBLY SCREW PWH 8x5 8 2 H100128 128 x2 SCREW 5 8 314 x1 A REVISION TAG A REVISION TAG 1 A100314 129...