![Backyard Discovery READY SHED Скачать руководство пользователя страница 58](http://html1.mh-extra.com/html/backyard-discovery/ready-shed/ready-shed_manual_3441945058.webp)
SHINGLES - RIDGE CAP
•
You have finished your ridge cap.
35
FLUSH
FRONT OF SHED.
•
Install ridge caps 5" back, as shown.
RIDGE CAP 12
(1 PLCS)
RIDGE CAP 12
(2 PLCS)
NOTE: NAILS ARE COVERED BY NEW RIDGE CAPS.
REPEAT THIS STEP
(15 TIMES)
7/8" ROOFING NAIL GALV.
(2 PLCS)
NOTE: THIS IS THE ONLY SHORT 9 1/4"
RIDGE CAP, IT WAS SPECIALLY DESIGNED
FOR THE REAR OF YOUR SHED.
FRONT OF SHED.
TOP VIEW
• Install last ridge cap 5" back as shown, it should be flush with the back of your
shed.
9 1/4
• Install 5" Cap as shown. It should be flush with the back of your shed and cover up
the nails from the prior step.
WHEN FINISHED USE
PROPER ROOF COATING
MATERIAL AROUND NAILS
TO PREVENT LEAKS.
SHINGLE CAP 5 x 11.75
(1 PLS)
7/8" ROOFING NAIL GALV.
(2 PLS)
RIDGE CAP 9.25
(1 PLCS)