![Backyard Discovery READY SHED Скачать руководство пользователя страница 57](http://html1.mh-extra.com/html/backyard-discovery/ready-shed/ready-shed_manual_3441945057.webp)
FRONT OF SHED.
34
• INSTALL FIRST RIDGE CAP FLUSH WITH SHINGLES BELOW AS SHOWN.
START AT THE FRONT OF YOUR SHED AND WORK TOWARDS THE REAR.
- RIDGE CAP 12
(17)
- RIDGE CAP 9.25
(1)
- SHINGLE CAP 5 x 11.75
(1)
- 7/8" ROOFING NAIL GALV. - H100446
(38)
RIDGE CAP INSTALLATION
• IF NEEDED BEND EXCESS SHINGLES OVER PEAK BEFORE STARTING ON RIDGE CAPS.
7/8" ROOFING NAIL GALV.
(2 PLCS)
RIDGE CAP 12
(1 PLCS)
5 1/2
ONE NAIL PER SIDE ABOVE WEATHER SEAL.
WEATHER SEAL
TOP VIEW
1