STEP 3
STAND UP UPRIGHT ASSEMBLIES AND ATTACH (2) K2 GROUND BOARDS TO E1 & E2
TOWER LEGS AND TO (2) E3 TOWER LEGS USING (8) 2-3/4" BOLTS, LOCK WASHERS
AND 1-3/4" BARREL NUTS.
ATTACH (2) M8 WALL RAIL TO E3 TOWER LEGS USING (4) 2-3/4" BOLTS, LOCK WASHERS
AND 1-3/4" BARREL NUTS.
USING K3 AS A TEMPLATE, PILOT DRILL USING 1/8" DRILL BIT AND ATTACH K3 FRONT
ARCH TO E3 TOWER LEGS USING (4) 2" LAG SCREWS AND LOCK WASHERS.
ATTACH L3 WALL RAIL TO E3 TOWER LEGS USING (4) 2-3/4" BOLTS, LOCK WASHERS
AND 1-3/4" BARREL NUTS.
ATTACH M6 FLOOR RAIL TO E1 & E2 TOWER LEGS USING (2) 2-3/4" BOLTS, LOCK
WASHERS AND 1-3/4" BARREL NUTS.
USING L8 AS A TEMPLATE, PILOT DRILL USING 1/8" DRILL BIT AND ATTACH L8 CLUB
HOUSE WALL RAIL TO E1 & E2 TOWER LEGS USING (4) 2-1/2" LAG SCREWS AND LOCK
WASHERS.
NUT BARREL
WH 5/16x1-3/4
(18)
WASHER
LOCK EXT
12x19
(18)
WASHER
LOCK EXT
8x19
(26)
LAG SCREW
WH 5/16x2
(4)
BOLT WH
5/16x2-3/4
(18)
LAG SCREW
WH 5/16x2-1/2
(4)
K2 - BASE BOARD - W100563
5/8"x5 1/4"x40" (16x134x1016)
M8 - WALL RAIL - W100580
5/8"x3 3/8"x40" (16x86x1016)
K3 - FRONT ARCH - W100564
5/8"x5 1/4"x40" (16x134x1016)
L3 - WALL RAIL - W100568
5/8"x4 3/8"x40" (16x112x1016)
M6 - FLOOR RAIL - W100578
5/8"x3 3/8"x40" (16x86x1016)
L8 - CLUB HOUSE WALL RAIL - W100569
5/8"x4 3/8"x40" (16x112x1016)