STEP 26
START BY ATTACHING THE
EV CLIMBING ROCKS TO N83
ROCK WALL BOARDS USING
(12) 1-1/4" BOLTS, LOCK
WASHERS, FLAT WASHERS
AND 1/4" T-NUTS.
ATTACH N82 ROCKWALL
TOP CAP TO (2) H73 ROCK
WALL RAILS USING (4) 1-1/2"
WOOD SCREWS.
STARTING AT THE TOP OF
ROCK WALL ASSEMBLY,
ATTACH N83 ROCKWALL
BOARD FLUSH WITH
OUTSIDE EDGES OF H73
RAILS AND ALTERNATE M72
ROCKWALL BOARDS AS
SHOWN USING (56) 1-1/2"
WOOD SCREWS.
STEP 27
PILOT DRILL USING 1/8" DRILL BIT AND ATTACH ROCKWALL ASSEMBLY TO H2 RIGHT
FLOOR RAIL USING (2) 2-1/2" LAG SCREWS AND LOCK WASHERS. SEE LOCATION
DIAGRAM FOR DRILLING LOCATIONS.
SCREW PFH
8x1 1/2
(60)
WASHER
LOCK INT
8x15
(12)
T-NUT 1/4
(12)
LAG SCREW
WH 5/16x2 1/2
(2)
WASHER
LOCK EXT
8x19
(2)
H73 - ROCK WALL RAIL - W102361
24"x86"x1237" (24x86x1237)
M72 - ROCK WALL BOARD - W103331
5/8"x3 3/8"x20 1/4" (16x86x514)
N83 - ROCK WALL BOARD HOLES - W102363
5/8"x3 3/8"x20 1/4" (16x86x514)
EV - CLIMBING ROCK - GREEN - A100064
N82 - ROCKWALL TOP CAP - W102364
5/8"x2 3/8"x20 1/4" (16x60x514)
BOLT PTH
1/4x1 1/4
(12)