background image

Installing and connecting the PDU

5.1  Safety instructions for the installation

NOTICE!
Risk of damage due to improper fitting and instal-

lation!

Improper fitting and installation can cause substantial

damage to property.

All the installation work must be carried out by an

IT specialist.

Only install the PDU while it is de-energised.

Before starting the work, ensure that you have suf-

ficient room for the installation.

Ensure that installation area is clean and tidy.

Install the components properly and lay the con-

nectors and cables in a manner that is safe.

Secure the components so that they cannot fall

down or over.

5.2  Requirements of the installation location

n

There must be enough space in the rack to install the PDU.

n

The PDU may only be operated within the environmental con-

ditions set out in the technical specifications.

n

The the PDU may not be used in potentially explosive atmos-

pheres.

n

The PDU may not be subjected to vibrations.

n

A location for the installation must be selected that does not

have excessive humidity, high temperatures, sources of elec-

tromagnetic interference, moisture, solvents, flammable gases,

dust or vapours.

n

There must be sufficient lighting.

n

Fire protection measures must be in place.

5.3  Installing the PDU

5.3.1  Overview

There are four options for installing the PDU in the rack:

n

Installation with mounting brackets (

Ä

 Chapter 5.3.2 "Installing

the PDU with the mounting brackets" on page 19

)

n

Installation with plug-in brackets via the rear of the PDU

(

Ä

 Chapter 5.3.3 "Installation with plug-in brackets via the rear

of the PDU" on page 20

)

Improper installation

Overview of the fitting options for

the PDU

Installing and connecting the PDU

Installing the PDU > Overview

01.03.2017

BlueNet PDU BN3000/3500/5000/7000/7500

17

Содержание BlueNet BN3000

Страница 1: ...BlueNet PDU BN3000 3500 5000 7000 7500 Mounting and installation instructions Read the instructions prior to performing any task...

Страница 2: ...strasse 33 70565 Stuttgart Germany Telephone 49 711 86602 0 Fax 49 711 86602 34 Email bluenet bachmann com Internet www bachmann com Bach 30131 DE 6 en_GB Bachmann GmbH 2017 01 03 2017 BlueNet PDU BN3...

Страница 3: ...te from the actual version The contents of these instructions are protected by copyright Their use is permitted in conjunction with the mounting and installation of the PDU Any use that exceeds this i...

Страница 4: ...ckets 19 5 3 3 Installation with plug in brackets via the rear of the PDU 20 5 3 4 Installation with plug in brackets via the sides of the PDU 21 5 3 5 Installation with the mounting solution in the r...

Страница 5: ...x BN5000 x x BN7000 x x x BN7500 x x x x Fig 1 Product overview 16 amp version A Fitting slots for plug in bracket B CEE connector plug C Sockets D Connector panel for GPIO network Modbus and sensors...

Страница 6: ...port supported on the PDU in software version V2 01 and higher F LAN port G USB port A Sensor port S1 to connect a sensor via a cat 5e cable B Modbus port M1 to connect a Master PDU and upstream Slav...

Страница 7: ...Fitting slots for plug in bracket B Attachment for the mounting bracket C Attachment for the mounting solution in the rack D Plug in bracket for mounting the PDU via the back 2 each E Plug in bracket...

Страница 8: ...network and the HTTP HTTPS SSH SNMP and Modbus TCP protocols can be used The PDU is made of a sturdy aluminium profile and is installed directly into the rack Depending on the type the PDU has a range...

Страница 9: ...ly orange PDU starting up White Continuously white Performing factory reset after releasing the pressed buttons Purple 500 ms off 500 ms purple An update of a PDU is in progress Purple red 500 ms off...

Страница 10: ...nication functioning Purple 500 ms off 500 ms purple An update of the internal modules of a PDU is being carried out Purple red 500 ms off 500 ms purple 500 ms off 500 ms red Error during update of th...

Страница 11: ...r Slave PDUs are connected from their Modbus port M1 with the Modbus port M2 of the Slave PDU con nected upstream The PDU can be integrated into the network via the LAN port The data transfer rate is...

Страница 12: ...the relay switches Pin 1 is connected to the normally open contact Pin 3 The GPIO port RJ 12 is supported on the PDU in software version V2 01 and higher 1 5 Scope of delivery Fig 12 Scope of delivery...

Страница 13: ...humidity The values can be displayed on the display and on the web interface The CAT5e cable required to connect the sensors is included The GPIO module can be used to connect the PDU to external dev...

Страница 14: ...ation of symbol and signal word indicates that there is a potential danger that can result in damage to property if it is not avoided This symbol highlights useful tips and recommenda tions as well as...

Страница 15: ...IT systems and have a basic knowledge of electrical engineering Due to their specialist training IT specialists are in a position to assess the consequences of their actions in dealing with the system...

Страница 16: ...n GmbH immediately n If possible keep the packaging of the PDU so that the PDU can be safely stored and transferred in the future Dispose of the packaging material that is no longer required in a mann...

Страница 17: ...l con ditions set out in the technical specifications n The the PDU may not be used in potentially explosive atmos pheres n The PDU may not be subjected to vibrations n A location for the installation...

Страница 18: ...ing options for the PDU A Fitting slots for plug in bracket B Attachment for the mounting bracket C Attachment for the mounting solution in the rack D Plug in brackets for mounting the PDU via the bac...

Страница 19: ...inst the rack and mark the position of the mounting holes 3 Remove the mounting brackets Fig 15 from the PDU and screw them onto the rack in the positions marked Fig 14 Installation with mounting brac...

Страница 20: ...cialist 1 Insert the plug in brackets into the rear slots on both sides Fig 17 2 Position the PDU in the rack Fig 16 Rack with PDU Fig 17 Fitting the plug in brackets Installing and connecting the PDU...

Страница 21: ...nnel n IT specialist 1 Insert the plug in brackets into the side slots on both sides Fig 19 2 Position the PDU in the rack Fig 18 Rack with PDU Fig 19 Fitting the plug in brackets Installing and conne...

Страница 22: ...nt for the mounting bracket with a screwdriver Fig 21 Fig 20 Rack with PDU Fig 21 Unscrewing the attachment for the mounting bracket A Attachment for the mounting bracket B Attachment for the mounting...

Страница 23: ...at the PDU is fitted securely into the cabinet Fig 22 Fitting the PDU in the rack with mounting solution A PDU B Mounting solution in the rack example Fig 23 Rack with PDU Installing and connecting th...

Страница 24: ...vice from the mains completely unplug its power cable from the power socket Do not touch the power cable plug with wet hands When unplugging the power cable plug from the power socket always pull the...

Страница 25: ...Modbus port This way up to 11 Slave PDUs can be cascaded with one Master PDU and managed using the web interface It is not possible to connect individual PDUs with a crossover cable Personnel n IT spe...

Страница 26: ...to open the Settings menu 4 Use the key to select the Modbus Config menu and con firm by pressing the key Setting the Modbus address on the Slave PDU Fig 26 BlueNet menu Fig 27 System menu Fig 28 Set...

Страница 27: ...ed from 1 to 16 If necessary use the button to switch between digits Use the button to set the address for the Slave PDU and con firm by pressing the button Fig 29 ADDR menu Fig 30 Setting the Modbus...

Страница 28: ...1 Press any button on the PDU to activate the display 2 Use the button to open the System menu 3 Use the button to open the Settings menu 4 Use the button to select the Orientation menu and confirm by...

Страница 29: ...After con necting the power supply and the network connection the PDU automatically obtains an IP address from the server Personnel n IT specialist 1 Press any button on the PDU to activate the displ...

Страница 30: ...n the web browser If there is no DHCP server in the network the IP address has to be assigned manually Consult the operating instructions to find the procedure for assigning the IP address manually Fi...

Страница 31: ...e correct operating instructions for your software version of the PDU You can read the software version on the PDU Personnel n IT specialist 1 Press any button on the PDU to activate the display 2 Use...

Страница 32: ...r supply The PDU is not connected correctly n Check the connections The status LED does not light up There is no voltage n Check the fuse if any n Connect the on site power supply The PDU is not conne...

Страница 33: ...of damage to the PDU due to improper cleaning Cleaning that is carried out improperly can damage the PDU Do not use strong acids or bases for cleaning Only clean the PDU with a lint free cloth Do not...

Страница 34: ...isconnect the CEE plug from the power supply 2 Unplug the network cable 3 Unplug the plugs of the connected devices 4 Dismantle the PDU from the rack 10 2 Disposal Electric and electronic components m...

Страница 35: ...e housing of the PDU and contains the following information n Product name n Item number n Serial number n MAC address physical network address n Rated current n Rated voltage n Power frequency n Manu...

Страница 36: ...24 Connecting the sensors 25 Overview 17 with plug in brackets via the rear of the PDU 20 with plug in brackets via the sides of the PDU 21 with the mounting bracket 19 with the mounting solution in...

Отзывы: