H-25C Instruction Manual
Instruction 3015-0216
54
[Example of Facility 2]
Reference Figure 2 shows an example of facility for efficiently implementing leakage inspection.
This facility is also provided with countermeasures to prolong the service life of sensors and activated charcoal
filters.
If the facility to be provided is similar to that shown in Reference Figure 2, take the following requirements into
consideration.
(1)
The air flow inside the facility cannot cause negative pressure.
(2)
Air is fed to the inspection area in an evened-out flow.
(3)
The inspection area cannot be so seriously affected by the temperature and humidity of the outside air.
Содержание H-25C
Страница 14: ...H 25C Instruction Manual Instruction 3015 0216 14 1 6 Internal Flow Paths Measured Gas Internal Flow Path...
Страница 22: ...H 25C Instruction Manual Instruction 3015 0216 22 When power is applied the display will appear as shown below...
Страница 27: ...H 25C Instruction Manual Instruction 3015 0216 27 BACHARACH...
Страница 58: ...H 25C Instruction Manual Instruction 3015 0216 58 Notes...