(7) Installa�on layout
(8) Mechanical locking tubes
4.5
Assembly
4.5.1
Draw pit center line then other dimension lines in founda�on pit in accordance with below diagram.
4.5.2
Two mechanical locking tubes are to be fixed symmetrically onto front wall by anchor bolts as shown in above
diagram. Exact posi�ons symmetrized to pit center line are essen�al.
post
2550
4326
3530
850
540
5018
1176
1176
2500
Cylinder
bracket
Pit center
line
Mechanical
locking tube
Oil tube
①
①
①
①
Expansion bolt M12*50
①
10
P
it
Lift
Installation
Содержание Starke 2127
Страница 1: ...User Manual for Pit Lift...