4.1.12
Warning: Keep any flammable item
s
away from the parking li� as there may be electric spark when
electrical system works.
4.1.13
This mark means safety warning.
4.2
Preparation
Before installing this parking li�, check the following:
4.2.1
The working area should be well planned and
with
enough space.
4.2.2
Keep obstacle
s
away from instal
l
area.
4.2.3
Founda�on construc�on is to be carried out in accordance with the founda�on requirements in this manual
and local regula�ons. Contact
Babcopark
or local
Babcopark
partner before construc�on work if customized
dimensions or special project condi�on
exist
.
4.2.4
Founda�on pit with wrong dimensions, poor construc�on, insufficient concrete thickness or absence of
drainage is not allowed to be used for installing parking li�.
4.2.5
Proper protec�on measures shall be carried out during installa�on and usage to protect components from
sun, rain, snow and
moisture,
in case the products have to be installed outdoor
s
.
4.2.9
A p
roper wiring route from
the
main power supply to the parking li� is good for easier installa�on and long-
term usage. Make sure all wires are connected correctly and protected well.
4.2.10
Draw up posi�ons of the post baseplates with chalk with less than 3mm tolerance.
4.2.11
Check carefully to make sure the layout is correct.
4.3
Necessary tools
4.4
Foundation treatment
4.4.1
Reinforced concrete with minimum 200mm depth under post base and 100mm at other area is essen�al for
founda�on pit. The concrete quality grade shall be compliant of the sta�c requirements of the construc�on with Min.
C30 grade.
4.4.2
Pour concrete above rammed earth at the base of posts as shown in below diagram.
4.4.3
Perfectly flat floor and wall surfaces without
any
protruding sec�ons such as border edgings, pipes and tubes,
etc. The tolerance of floor and wall surfaces shall be less than 2mm.
4.4.4
Pre-embedded of anchor bolts
are
not needed.
1 set of non-adjustable spanner, adjustable
spanner and allen wrench.
1 set of screwdriver (including slo�ed screwdriver
and phillips screwdriver)
1 piece of leveling instrument for 1M and 3M.
1 forkli� with 2T capacity.
1 piece of percussion drilling with 12x200 aiguille.
Insulated rubber tape
Sealing tape
1
e
lectric portable drill
Some power line
1 hammer
Some duster cloth
1
g
rease gun
1 piece of tapeline for 5M
!
07
P
it
Lift
Installation