![B2 HVA28TD Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/b2/hva28td/hva28td_user-manual_461664029.webp)
5 Test Procedure
©
b2electronic
gmbh
DHV0053 b2 EN
27
Step
Procedure
S3
Connect HV Test Lead
•
Screw the HV test lead into the HVA HV output connector (11)
•
Connect the HV cable shield to earth.
•
Connect other end of HV test lead (clamp including screen protector) to the
DUT.
S4
Verify Connections
•
Check that all cables are attached securely.
S5
Configure communication port (13)
For USB Data Transfer Mode:
•
Connect the USB Flash adapter
•
Insert USB stick
Otherwise:
Verify that RS232 cable is
not
connected to the HVA!
S6
Turn key switch (7) to the “ON” position
S7
The HVA system automatically boots.
•
Start-up default screen appears
”Start Test” screen
Select appropriate option from default screen and proceed to appropriate section
for further instructions:
•
See 5.2 Manual Test Mode or
See 5.3 Automatic Test Mode
Содержание HVA28TD
Страница 1: ......
Страница 2: ......
Страница 4: ...1 Forward 2 DHV0053 b2 EN b2electronic gmbh ...
Страница 73: ......