ULT FREEZER – USER MANUEL
5
Updated 19. April 2021
Chapter 2: Precondition
Before you install the ULT Freezer, you need to prepare the site for installation. Examine the
location where you intend to install the Freezer. You must be certain that the area is level and of
solid construction.
In addition, a dedicated source of electrical power must be located near the installation site.
Carefully read this chapter to learn:
•
Storage requirements.
•
Location requirements.
•
Electrical power requirements.
•
Space requirements.
•
Service utility requirements.
•
Environment Requirement.
Storage.
If the Freezer will be stored for a period without power, the door and inner doors should be kept
open for free circulation of air inside the cabinet to avoid corrosion of the inner liner.
Environmental protection and disposal.
The packaging is designed to protect the appliance and its components during transportation,
and it is made of recyclable materials.
•
Please return the packaging to an official collection point for recycling.
•
Old appliances contain reusable materials and should not be disposed off together with
household refuse.
•
Remove the spring-action hinges from the appliance, to prevent children from being entrapped in
the appliance.
•
Ensure that no part of the refrigeration tubing is damaged as the refrigerant in the appliance risks
leaking to the environment.
•
Information about refrigerant type and amount will be found on the Rating plate on the rear of the
appliance (Fig. 1).
Figure: 1