![AZALEA AVIATION SPYDER 100 HP Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/azalea-aviation/spyder-100-hp/spyder-100-hp_assembly-manual_3042491016.webp)
Section 5 - 4
Azalea Aviation Copyright 2014
Fig. 4 – Lower Bracket bolted in place.
Fig. 5 – Starter and Ring Gear Finally Bolted
Be sure to rotate the crankshaft and check for clearance and interference. Pulses
felt during the rotation that is caused by the magnets in the alternator. Onto the
next step!
Содержание SPYDER 100 HP
Страница 6: ...Section 3 3 Azalea Aviation Copyright 2014 Fig 1 Checking clearance Fig 2 Installing Cover plate...
Страница 15: ...Section 5 3 Azalea Aviation Copyright 2014 Fig 2 Block Off Plate Installed Fig 3 Ring gear to Bendix clearance...
Страница 24: ...Section 6 8 Azalea Aviation Copyright 2014 Finished and ready for next step...
Страница 39: ...Section 8 7 Azalea Aviation Copyright 2014 Heads are installed and torqued On to the valve train...
Страница 42: ...Section 9 3 Azalea Aviation Copyright 2014 Fig 1 Inserting pushrod into guide plate Fig 2 Rocker assembly...
Страница 58: ...Section 12 4 Azalea Aviation LLC Copyright 2014 A finish up engine on display wires are cleanly routed and tied...