background image

 

 

ADDITIONAL SECTIONS: 

EK04-1-Display CLC/CLT/CLP 

EK04-2-Display SYC/SYT/SYP 

EK04-3-Display DMCx/DMTx/DMPx 

 

 

   

 

EVOS LOP Content 

 

EVOS Serial Communication LOP 

 

Mounting Dowels and Screws 

 

Installation and Usage Manuals 

 

Figure 1 

Figure 2

 

Figure 3

 

Содержание EVOS Series

Страница 1: ...APPENDIX 3 LANDING OPERATION PANEL INSTALLATION EVOS SERIES SERIAL COMMUNICATION LOP INSTALLATION MANUAL Document Version v1 03 ...

Страница 2: ...ONS EK04 1 Display CLC CLT CLP EK04 2 Display SYC SYT SYP EK04 3 Display DMCx DMTx DMPx EVOS LOP Content EVOS Serial Communication LOP Mounting Dowels and Screws Installation and Usage Manuals Figure 1 Figure 2 Figure 3 ...

Страница 3: ...holes by placing the backplate where you want to install Drill holes for M6 5 dowels as shown by X in figure Drill a hole in the wall which the 40 28mm rectangular socket coming from the controller can pass trough B Insert 4 dowels into the drilled holes X Fix the backplate to the wall using 4 M4 30 screws to complete the mechanical installation ...

Страница 4: ...ll LOPs to this unit wth CAN BUS cables with dual white rectangular sockets 2 3 If there is no electronic pit control card with serial communication connect the LOP on the lowest floor as shown in Figure 5 and complete the process 3 Operation and Setting Procedures Select the display you have used for display settings from EK04 and follow the instructions After completing the settings close the to...

Страница 5: ...s steel cleaners to clean the panels 4 2 Do not use any detergent or acids to clean panels 4 3 Avoid to contact any liquid to the LOP 4 4 In case of an electrical failure switched off the LOP and contact with Aybey Elektronik Technical Service ...

Отзывы: