
USER MANUAL
19
_________________________________________________________________________________________________________________
13. Start-up
Plug feeder into 230V power supply socket. When
the pan is empty plug feeder output connector into
12V socket at back of the balance. Autotests and
internal calibration will be performed.
Scale display test (autotests of internal electronic
elements C1:8 displayed only when any test result
is negative)
Displaying firmware version.
Test of internal calibration.
Internal calibration (in not legally verified balances
can be terminated using key
–
CAL End
communicate confirms).
After zeroing the balance is ready to weighing.
It is recommended before making measurements to wait until internal temperature of
balance stabilize. To accomplish that, the balance should be turned on for more than 2
hours before measurements. From the perspective of measurements accuracy
continuous balance operation is beneficial.
g
~45 seconds
0
Max Min e= d= I
kg