![Axi STS 7030 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/axi/sts-7030/sts-7030_manual_3036314011.webp)
3
INSTALLATION, OPERATING AND MAINTENANCE MANUAL
TABLE OF CONTENTS
GENERAL SPECIFICATIONS .................................................................................................................................................. 8
STS 7030 .................................................................................................................................................................................................................................................................. 8
SYSTEM COMPONENTS ......................................................................................................................................................... 8
Y-Strainer ................................................................................................................................................................................................................................................................. 8
Pump / Motor: ..................................................................................................................................................................................................................................................... 8
Fuel Conditioner ................................................................................................................................................................................................................................................. 9
Primary Filter ......................................................................................................................................................................................................................................................... 9
Secondary Filter/ Water Separator .......................................................................................................................................................................................................... 9
Weatherproof double door wall-mounted enclosure with lockable handles / latches ........................................................................................ 9
Stainless steel plumbing ............................................................................................................................................................................................................................... 9
PRIMARY INSPECTION ........................................................................................................................................................... 9
Checklist: ................................................................................................................................................................................................................................................................. 9
INSTALLATION .......................................................................................................................................................................... 9
Mounting ............................................................................................................................................................................................................................................................. 10
Electrical ................................................................................................................................................................................................................................................................ 10
Plumbing ............................................................................................................................................................................................................................................................. 11
Typical plumbing / Above ground tank installation (schematically) ............................................................................................................................. 12
IMPORTANT INSTALLATION PRECAUTIONS ................................................................................................................ 12
PRIMING THE SYSTEM .......................................................................................................................................................... 13
Priming procedure: ........................................................................................................................................................................................................................................ 13
TOUCH-SCREEN CONTROLLER - ALARM FEATURES ................................................................................................. 14
INITIAL START-UP / COMMISSIONING CHECKLIST .................................................................................................... 15
Flow switch setting / adjustment (“No Flow Alarm”) ............................................................................................................................................................... 15
Gauge venting / accuracy ......................................................................................................................................................................................................................... 15
Initial test procedure ..................................................................................................................................................................................................................................... 15
OPERATION ............................................................................................................................................................................. 17
Emergency Stop .............................................................................................................................................................................................................................................. 17
Pump Operation .............................................................................................................................................................................................................................................. 17
SETTING THE CURRENT TIME AND DATE ......................................................................................................................................................................................... 17
PROGRAMMING THE TIMER ..................................................................................................................................................................................................................... 18
Fuel Line Leak .................................................................................................................................................................................................................................................... 18
Stabilizing and Optimizing Fuel Quality ........................................................................................................................................................................................... 18
MAINTENANCE ....................................................................................................................................................................... 19
Preventative Maintenance ........................................................................................................................................................................................................................ 19
Servicing Y-Strainer ........................................................................................................................................................................................................................................ 21
Servicing primary filter ................................................................................................................................................................................................................................. 21
Servicing water separator .......................................................................................................................................................................................................................... 22
Servicing secondary filter ........................................................................................................................................................................................................................... 22
Changing the secondary filters .............................................................................................................................................................................................................. 22
TROUBLESHOOTING ............................................................................................................................................................ 23
AUTOMATIC FUEL FILTRATION SYSTEMS WARRANTY ............................................................................................ 25
LIMITED WARRANTY ............................................................................................................................................................ 25
TECHNICAL ASSISTANCE AND ORDERING ................................................................................................................... 26
Replacement filter elements ................................................................................................................................................................................................................... 26
STS 7030 SYSTEM IDENTIFICATION ................................................................................................................................ 26
APPENDIX A - ABBREVIATIONS USED IN THIS MANUAL .......................................................................................... 27
APPENDIX B – DRAWINGS .................................................................................................................................................. 28
Содержание STS 7030
Страница 2: ...Optimal Fuel Quality Reliable Power Product Submittal Package Section 1 CSI Specifications...
Страница 3: ......
Страница 8: ......
Страница 10: ...2...
Страница 12: ...4...
Страница 24: ......
Страница 36: ...28 APPENDIX B DRAWINGS...
Страница 37: ...Optimal Fuel Quality Reliable Power Product Submittal Package Section 3 Electrical Drawing...
Страница 38: ......
Страница 39: ......