19
REV0303MTCX010318
Maintenance
! IMPORTANT ! It is recommended that only qualified, experienced personnel, familiar with this equipment,
who have read and understood all the instructions in this manual should install, operate, and maintain the
system.
! IMPORTANT ! Always disconnect the system from the electric power supply before working or servicing
it. Do not proceed with any maintenance unless the pressure or vacuum has been released, the system has
been allowed to reach ambient temperature, and all fluids have been drained.
Draining and Storing the System
1.
Before releasing the quick disconnect couplings, allow all fuel to flow out of the hoses by draining the system, or take
the suction hose out of the tank while the pump is still running and wait till system is purged and empty.
2. Place an appropriate container under each drain valve. Open both the valve on the separator and the valve under the
pump. Use the air purge valve on top of the separator to make sure all of the fluid can be drained from the system.
Opening the valves and the air purge valve will allow fuel to flow down and out of both hoses into the tank.
Pump
Check pump for leaks, worn vanes, and if bypass valve operates correctly. We highly recommend carrying a spare pump.
The MTC pump can be easily changed in a matter of minutes by opening the unions and/or short hose connections. Spare
part kits are also available for all MTC pumps. Keep the pump lubricated and pour some oil into pump head for storage.
LG-X Fuel Conditioner
Particles and rust can collect inside the LG-X unit, and over time cause a flow restriction and/or diminish its effectiveness.
Open the lid of the LG-X Fuel Conditioner by unscrewing the lid screws and clean the magnet and fuel chamber. Inspect
o-rings prior to reassembly.
Suction and Discharge Hoses
We recommend replacing the suction hose every year and the discharge hose every two years. Heavy use, visual
deterioration, damage, or poor condition and excessive wear can require an even earlier change.
MAINTENANCE
PRIMAR
Y INSPECTION
O
VER
VIEW
S
Y
S
TEM C
OMPONENT
S
C
OMMISSIONING
OPERA
TION
PRIMING
Содержание MTC-X
Страница 35: ...35 REV0303MTCX010318 NOTES...