EN
48
F - MAINTENANCE AND UPKEEP
1 - MAINTENANCE WORK
Maintenance work must be carried out by the
installer or a qualified individual to guarantee the
installation’s operation and safety.
The number of maintenance and upkeep
operations must be proportional to the frequency
the motorised gate is used.
For use of about 10 cycles per day, it is necessary
to provide:
• maintenance of the mechanical parts every 12
months: tightening screws, lubrication, checking
the hinges, stops and gate balance, etc.
• maintenance of the electronic parts every 6
months: motor operation, photocells, control
devices, etc.
2 - OPERATING INDICATORS
This system has two operating indicators: the
battery charge level (optional) and the event log.
OK
Battery charge
PROG
OK
Code 1
PROG
–
+
Code 2
Code 3
–
+
Code 4
–
+
OK 3 s
delete log
from
newest to
oldest
MENU
0
(last error)
L1
L2
L3
L4
L1
L2
L3
L4
L1
L2
L3
L4
L1
L2
L3
L4
event log
L1
L2
L3
L4
OK
CONNECTED MOTOR DRIVE KIT WITH ACTUATORS