background image

CTR INSTALLATION GUIDE

Figure 1-1.

CTR 8540 Front Panel

Item

Description

1

Fan Tray

Fan tray houses the Fan module with four software controlled fan units. The

Fan is a compulsory module.

2

RJ-45 V24 Main-

tenance Port

Port for serial data connection of PC craft tool.

3

Status LEDs

Chassis operational status.

4

Power Connector

D-sub M/F 2W2 connector for -48 Vdc power supply (+ve earth).

l

Operational voltage range: -40.5 to -56 Vdc.

l

Connection is reverse polarity protected.

l

The dc supply must be UL or IEC compliant for SELV (60 Vdc maximum
limited).

5

Slot 1. PWR module

installed.

Universal plug-in slot. Accepts all plug-in modules.

Slot 1 must be used where power supply protection is required (using the
PWR plug-in module).

6

8x Switch Ports

RJ-45 10/100/1000Base-T switch ports. Each RJ-45 includes an orange Activ-

ity LED and a green Connection LED.

Port 1 is default enabled for Ethernet connection of PC craft tool.

7

Slot 2. RACx2 module

installed.

Slot accepts RAC or PoE modules.

8

Slot 3. RACx2 module
installed.

Slot accepts RAC or PoE modules.

9

4x SFP Switch Ports

SFP ports (cages). SFP transceivers are available for optical or electrical con-
nection.

10

Protection Port

Quad SFP port (cage). A Protection cable comprising back-to-back to con-
nected optical Quad SFPs is installed between CTR chassis to enable cross-
chassis protection and switch stacking.

11

Diversity Port

Quad SFP port (cage). A Diversity cable comprising back-to-back to connected
optical Quad SFPs is installed between CTR chassis to enable space or fre-
quency diversity on cross-chassis radio link pairings.

12, 13 Trib. connectors

HDR connectors for tributary cable connection. Service supports:

l

16xE1 or 16xDS1 (8x per connector).

l

75 ohm unbalanced or 120 ohms balanced on E1 tribs.

l

Individual line code selection for AMI or B8ZS on balanced 100 ohm DS1
tribs.

l

Mapping to E1/DS1 pseudowires (CESoETH, unstructured).

14

Slot 4. PoEx2 module

installed.

Slot accepts RAC or PoE modules.

Installation Requirements

This table lists cautions, rules, and guides for CTR chassis installation.

260-668240-001

DECEMBER 2014

3

Содержание CTR 8540

Страница 1: ...CTR 8540 GETTING STARTED Rev 003 December 2014 HARDWARE INSTALLATION 260 668255 001...

Страница 2: ......

Страница 3: ...ce and of measures to avoid any danger to themselves to any other personnel and to the equip ment 2 Access to the Equipment Access to the equipment in use must be restricted to service personnel only...

Страница 4: ...Getting Started Installation 1 Purpose 1 Introduction 1 Unpacking 2 Installation 2 Installation Requirements 3 Installation Procedure 5 Adding Modules to CTR 6 Module Installation Requirements 7 Modul...

Страница 5: ...int a user is expected to make use of the CTR Installation Guide which includes guidance on associated RF units ODUs IRU 600 antennas antenna alignment and much more Introduction CTR 8540 provides in...

Страница 6: ...cal or electrical media l Port trib cables l ODUs or IRU 600 l Antennas l ODU cable kits l Serial cable or serial cable serial USB adapter to provide connection from your PC to the CTR Maintenance V 2...

Страница 7: ...stalled Slot accepts RAC or PoE modules 8 Slot 3 RACx2 module installed Slot accepts RAC or PoE modules 9 4x SFP Switch Ports SFP ports cages SFP transceivers are available for optical or electrical c...

Страница 8: ...ct device main switch Power Supply 24 Vdc An external 24 Vdc to 48 Vdc converter is required at sites using 24 Vdc powering D C Supply Ground Con nection CTR equipment has a connection between the ear...

Страница 9: ...t ground wire path to the rack ground bar 2 Locate the CTR in the equipment rack and secure it using four No 12 Phillips dome head screws from the CTR installation kit 3 Ground the CTR from the ground...

Страница 10: ...tributary cables as required For information on the available tributary cable sets refer to the CTR 8540 Installation Guide 8 Carry out a complete check of the installation When checked and correct o...

Страница 11: ...3000 series all outdoor radios and compliant 3rd party products Figure 1 3 POEx2 Module RACx2 Module Install in any slot to provide two radio interfaces for connection to Aviat ODU 600 ODU 300hp or IR...

Страница 12: ...module ensure its backplane connector is correctly engaged before applying sufficient pressure to bring the module panel flush with the front panel Revision time lag When swapping or installing CTR m...

Страница 13: ...arefully hold the module by its edges and line up the front PCB edges with the guides inside the module slot 5 Insert the module in the slot and gently push in until the front panel of the module is f...

Страница 14: ...ation has been completed with SD card Fan module and option modules fitted l Management access has been prepared To install the power cable 1 Run the supplied power cable through to a dedicated circui...

Страница 15: ...have the transmit mute set as the default unless otherwise specified If frequency and power settings are not correct interference can be caused to other links in the same geographical area CAUTION Al...

Страница 16: ...input voltage must be 48 V nominal 57 V maximum Laser and Fiber Optic Cable Hazards Any fiber optic transmitters used are IEC60825 1 21CFR1040 1 Class I compliant and present no danger to personnel in...

Страница 17: ...ading of a CTR indoor unit or units will not cause any reduction in the mechanical stability of the rack Fan Blades CAUTION Fan card houses hazardous moving parts Restricted Access CTR 8540 must be in...

Страница 18: ......

Страница 19: ......

Страница 20: ...260 668255 001 WWW AVIATNETWORKS COM...

Отзывы: