AVG 9 Internet Security © 2009 C opyright AVG Technologies C Z, s.r.o. All rights reserved.
133
9.11.3. Program Update Schedule
On the
Schedule settings
tab you can first check/uncheck the
Enable this task
item
to simply deactivate the scheduled program update temporarily, and switch it on again
as the need arises.
In the text field called
Name
(
deactivated for all default schedules
) there is the name
assigned to this very schedule by the program vendor. For newly added schedules (
you can add a new schedule by mouse right-click over the
Program update
schedule
item in the left navigation tree
) you can specify your own name, and in that
case the text field will be open for editing. Try to always use brief, descriptive and apt
names for your schedules to make it easier to later recognize them.
Schedule running
Here, specify the time intervals for the newly scheduled program update launch. The