Procedure
Time requirement
Securing the chassis in a mid-mount configuration
12–30 minutes
Grounding the chassis
12 minutes
Unpacking the shipping container
Remove the equipment in the shipping container. In addition to the chassis, the shipping container
includes an installation kit and a cover panel kit.
About this task
The installation kit includes extra screws and bolts to support a variety of installation options. You do
not need to use all of the hardware provided.
If the installation kit does not contain all of the components, contact Avaya Support.
Procedure
Unpack the shipping container for the AC chassis.
Virtual Services Platform 9010 chassis installation
October 2015
Installing the Avaya VSP 9000
29