background image

Chapter 7: Part numbers

The following table lists the Avaya Virtual Services Platform 9000 part numbers associated with the

hardware.

Products can be ordered with European Union Environmental Directive (EUED) Restriction of

Hazardous Substances (RoHS) (EUED RoHS) compliancy. EUED RoHS compliant products are

designated with -E5 or -E6 (for example EC1405A01-E6).

Table 30: Part numbers

Part number

Item

EC1402001-E6

Shipped assembly VSP 9012 12–slot chassis

EC1402002-E6

Shipped assembly VSP 9010 10–slot chassis (AC-input)

EC1404001-E6

9024XL 24 SFP+ I/O module

EC1404002-E6

9048GB 48 SFP I/O module

EC1404003-E6

9048GT 48 10/100/1000 I/O module

EC1404005-E6

9048XS-2 48 SFP+ I/O module

EC1404006-E6

9090SF Switch Fabric module for the VSP 9012 chassis

EC1404007-E6

9080CP CP module

EC1404008-E6

9012QQ-2 12 QSFP+ I/O module

EC1404009-E6

9095SF Switch Fabric module for the VSP 9010 chassis

EC1405A01-E6

9006AC power supply

EC1411001-E6

9012FC Side cooling module for the VSP 9012 chassis

EC1411002-E6

9012RC Fabric cooling module for the VSP 9012 chassis

EC1411004–E6

9012FCHS for the VSP 9012 chassis

EC1411006-E6

Spare front module filler module for the VSP 9012 chassis and VSP 9010
chassis

EC1411007-E6

Spare Switch Fabric filler module for the VSP 9012 chassis

EC1411009-E6

Spare auxiliary module filler module for the VSP 9012 chassis

EC1411010-E6

2GB Compact Flash memory card for 9080CP module

EC1411012-E6

9010CM Cooling module for the VSP 9010 chassis

EC1411013–E6

Spare Switch Fabric filler module for the VSP 9010 chassis

EC1411014–E6

Spare power supply filler panel for the VSP 9010 chassis

Table continues…

October 2015

Installing the Avaya VSP 9000

106

Comments on this document? [email protected]

Содержание Virtual Services Platform 9000

Страница 1: ...Installing the Avaya Virtual Services Platform 9000 Release 4 1 NN46250 304 Issue 07 01 October 2015...

Страница 2: ...city is specified in the documentation or other materials available to You Software means computer programs in object code provided by Avaya or an Avaya Channel Partner whether as stand alone products...

Страница 3: ...problem with your Avaya product or Hosted Service For a list of support telephone numbers and contact addresses go to the Avaya Support website http support avaya com or such successor site as design...

Страница 4: ...10 chassis installation 28 Chassis installation time requirements 28 Unpacking the shipping container 29 Installing the installation shelf 30 Reducing the chassis weight 32 Lifting the chassis 34 Secu...

Страница 5: ...hassis operations 86 Determining the minimum number of power supplies 86 Installing a new chassis 87 Powering up the system 92 Protecting modules 93 Removing external storage devices from the CP modul...

Страница 6: ...Platform 9000 NN46250 100 for a list of the documentation for this product Training Ongoing product training is available For more information or to register you can access the website at http avaya l...

Страница 7: ...t up to date documentation product notices and knowledge articles You can also search for release notes downloads and resolutions to issues Use the online service request system to create a service re...

Страница 8: ...e 5 Select any of the following to narrow your search Whole Words Only Case Sensitive Include Bookmarks Include Comments 6 Click Search The search results show the number of documents and instances fo...

Страница 9: ...g the Avaya Virtual Services Platform 9000 NN46250 304 for Release 4 1 Features There are no feature related changes in the current document in Release 4 1 Other changes There are no other changes Oct...

Страница 10: ...is to a Virtual Services Platform 9010 AC chassis if the Virtual Services Platform 9012 runs a software version earlier than Release 3 4 For more information about hardware and software compatibility...

Страница 11: ...e preceding figure Table 1 Figure notes for VSP 9010 chassis front view Number Component 1 CP modules 2 I O modules 3 Cooling modules 4 Power supplies Virtual Services Platform 9010 chassis fundamenta...

Страница 12: ...and eight power switches that connect the main power to the corresponding power supply bays The following figure shows the rear view of the AC input chassis Figure 2 VSP 9010 AC chassis rear view The...

Страница 13: ...r more information about the power consumption of each module see Component input power on page 99 If the chassis operates in a redundant power configuration you can upgrade or replace power supplies...

Страница 14: ...If you use n n redundancy and plug four power supplies in to power feed A and the remaining four power supplies in to power feed B this configuration gives you power feed redundancy Ensure that each...

Страница 15: ...ir exhaust for the SF modules is to the right of the SF module slots Figure 3 Front to back cooling in the Virtual Services Platform 9010 The following table identifies the numbered areas in the prece...

Страница 16: ...Virtual Services Platform 9010 and the Virtual Services Platform 9012 Table 4 Alarm threshold and shutdown threshold temperatures for VSP 9010 modules Modules on the VSP 9010 Module LED color Alarm th...

Страница 17: ...e If a module shuts down due to heat you must intervene to bring the slot back online After you correct the temperature issue and the heat condition clears you must bring the module back online The mo...

Страница 18: ...generation I O module on the left and the PIM component of a first generation I O module on the right Figure 4 Heat sensor locations in a first generation I O module The following figure shows the ba...

Страница 19: ...modules with the following command show sys info temperature Note The I O module alarm threshold and shutdown threshold temperatures differ for the Virtual Services Platform 9010 and the Virtual Servi...

Страница 20: ...9 47 90 95 7 FA 42 50 66 66 42 105 110 8 FPGA 67 51 52 55 53 52 55 57 61 67 51 90 95 8 FA 39 50 72 72 39 105 110 The following table describes the output for the show sys info temperature Table 6 Outp...

Страница 21: ...Specifies the FPGA or FA temperature when exceeded by one degree that causes the system to shutdown the module by removing power from the slot Virtual Services Platform 9010 show sys info output On t...

Страница 22: ...RONT FAN 2 2 OK FRONT FAN 2 3 OK FRONT FAN 2 4 OK Use the data in the following table to understand the output for the show sys info command on the Virtual Services Platform 9010 Value Description FRO...

Страница 23: ...as Normal Highest Temperature For VSP 9010 no rear fan zone exists as a result the temperature always reports as 0 C Fan Info FAN 1 Specifies the module type under card type FAN 2 Specifies the module...

Страница 24: ...ments depend on your hardware configuration Control Processor module The 9080CP module performs the following tasks runs all high level protocols for example Border Gateway Protocol BGP and Open Short...

Страница 25: ...independent and you can configure either building phase to any circuit Space requirements The installation site must provide sufficient free space around the chassis to ensure proper ventilation and...

Страница 26: ...sis cover panel kit The cover panel kit includes the cable management cover with two mounting brackets and screws and the air inlet cover with mounting bracket Screws and hardware The hardware require...

Страница 27: ...nitor the results of startup diagnostics Rack mounting hardware The hardware to mount the chassis in an equipment rack depends on your rack type Install the device in a standard EIA 310D 19 inch or ET...

Страница 28: ...nd damaged items do not install the chassis Call the Avaya Technical Solutions Center in your area Verify that the items in the shipping container match those on the shipment packing list Verify that...

Страница 29: ...kit and a cover panel kit About this task The installation kit includes extra screws and bolts to support a variety of installation options You do not need to use all of the hardware provided If the...

Страница 30: ...rest and then mark that location and the location of the rail guide holes on the front of the rack Start at the bottom of the rack and install subsequent chassis above it Note Fold or trim off the mar...

Страница 31: ...k support 4 Insert a Phillips screw through each installation shelf mounting hole and into the corresponding hole in the rack 5 If using hex nuts add a nut to each screw and then tighten using a hex w...

Страница 32: ...l additional components before you mount the chassis in the rack All unused slots must contain filler modules If you remove filler modules to reduce the chassis weight ensure you reinstall them after...

Страница 33: ...then grasp the two handles to gently pull the module out and away from the chassis Warning The cooling module is heavy Use both hands to support the weight of the module Virtual Services Platform 9010...

Страница 34: ...it Always use a mechanical lift when one is available Ensure you have at least three people to lift the chassis Use two people to lift the chassis at the sides and a third person to support the chassi...

Страница 35: ...is mounting bracket with the holes on either side of the vertical rack support 2 Ensure that the hole pairs on either side of the rack vertical supports match horizontally 3 Insert a Phillips screw th...

Страница 36: ...nfiguration The rack mounting brackets for the flush mount configuration are installed at the factory before the chassis ships Select the configuration that best meets your floor plan room layout or r...

Страница 37: ...screwdriver to tighten the screws Attaching the cable management Use this procedure to attach the cable management brackets and cable management cover to the top of the Virtual Services Platform 9010...

Страница 38: ...n the lower cable management bracket to the holes on the top of the chassis front 4 Use the screws to attach the bracket to the chassis 5 Align the tabs of each side of the cable management cover with...

Страница 39: ...k Do not attach this cover before you mount the chassis in a rack Procedure 1 Align the holes in the card guide lead in bracket with the holes in the chassis 2 Use the screws to attach the bracket to...

Страница 40: ...ng bracket and with the keyholes on the chassis 4 Insert the hooks into the slots and keyholes to secure the cover to the chassis Virtual Services Platform 9010 chassis October 2015 Installing the Ava...

Страница 41: ...e AC chassis Procedure 1 Insert the L shaped ends of the retainer into the holes on each side of the power switch 2 Push the L shaped ends up to fully engage the retainer Virtual Services Platform 901...

Страница 42: ...connect power and network cables to the system Before you begin Ensure you have a two hole cable lug that fits over the grounding studs Ensure you have a nut and a locking washer for the grounding stu...

Страница 43: ...assis As shown in the following figure the grounding studs are located on the bottom right of the chassis rear 3 Bond the chassis ground cable to the single point ground window Job aid The following f...

Страница 44: ...ssis frame ground studs 4 AC power inlets 5 6 AWG green yellow ground wire not provided 6 Single point ground The following figure shows the ESD ground strap input location on the front of the chassis...

Страница 45: ...nt The following figure shows the ESD ground strap input location on the rear of the chassis Virtual Services Platform 9010 chassis installation October 2015 Installing the Avaya VSP 9000 45 Comments...

Страница 46: ...dicate the progress of the self test Upon successful completion of the self test within 5 to 15 minutes after you apply power depending on the module type the I O module Online LED transitions from am...

Страница 47: ...ds on the specific hardware configuration and redundancy needs Virtual Services Platform 9012 chassis introduction The front of the Virtual Services Platform 9012 chassis has ten slots for I O modules...

Страница 48: ...cooling modules Six separate IEC 60320 C20 AC power inlets and six power switches exist which connect the main AC power to their corresponding power supply bays The following figure shows the rear vie...

Страница 49: ...of the chassis and plug the power plugs in the corresponding power inlets at the back of the chassis The Virtual Services Platform 9012 chassis does not support DC input power supplies To configure a...

Страница 50: ...ower shelf which comprises of AC power supplies 1 2 and 3 and a B power feed to the B power shelf which comprises of AC power supplies 4 5 and 6 Apply this power configuration protection against simul...

Страница 51: ...he other slots provide additional bandwidth Important Avaya recommends that you install SF modules in both SF1 and SF4 to provide redundancy You must have a functioning SF module in at least one of th...

Страница 52: ...modules for the SF modules at the back of the chassis The cooling air flows from front to back to cool the SF and auxiliary modules You install the cooling modules for the I O and CP modules at the fr...

Страница 53: ...iption 1 I O module air inlet 2 Power supply fan air inlet 3 I O module air exhaust 4 9012FC or 9012FCHS cooling modules 5 Switch Fabric module air inlet 6 Airflow left to right Virtual Services Platf...

Страница 54: ...in second generation mode or first generation modules in first generation mode on the front right side of the Virtual Services Platform 9012 The 9012 cooling modules provide air movement and have an a...

Страница 55: ...fans exist in each 9012RC cooling module and pull air from front to back The platform polls all Switch Fabric module sensors and adjusts the 9012RC fan speed accordingly Note Do not place the Virtual...

Страница 56: ...irtual Services Platform 9010 and the Virtual Services Platform 9012 Table 10 Alarm threshold and shutdown threshold temperatures for VSP 9012 modules Modules on the VSP 9012 Module LED color Alarm th...

Страница 57: ...e If a module shuts down due to heat you must intervene to bring the slot back online After you correct the temperature issue and the heat condition clears you must bring the module back online The mo...

Страница 58: ...generation I O module on the left and the PIM component of a first generation I O module on the right Figure 14 Heat sensor locations in a first generation I O module The following figure shows the ba...

Страница 59: ...96 The system monitors the temperature every 30 seconds and displays the temperature on all the modules with the following command show sys info temperature Note The I O module alarm threshold and shu...

Страница 60: ...9 57 57 53 59 51 90 95 10 FA 41 49 64 64 41 105 110 The following table describes the output for the show sys info temperature command Table 12 Output for the show sys info temperature command Value D...

Страница 61: ...A temperature when exceeded by one degree that causes the system to shutdown the module by removing power from the slot Virtual Services Platform 9012 show sys info output On the Virtual Services Plat...

Страница 62: ...NORMAL Mode Status Normal Highest Temperature 40 C Fan Info Tray CardType Serial Part IO FAN 1 9012FCHS LBNNTMRJ000172 EC1411004 E6 IO FAN 2 9012FCHS LBNNTMRJ00015T EC1411004 E6 SF FAN 1 9012RC LBNNTM...

Страница 63: ...t available on this slot FA Highest Temperature This information applies only to second generation modules Specifies the temperature of the FA sensor located on the slice A value of indicates that thi...

Страница 64: ...the rack If you place each Virtual Services Platform 9012 in a row from left to right the chassis to the left discharges hot air into the cool intake of the chassis to the right To optimize airflow s...

Страница 65: ...vices Figure 17 Data center floor plan of hot and cold aisles The following table describes the layout of the data center in the preceding figure Table 13 Data center layout Diagram Description 1 Chas...

Страница 66: ...the right This installation does not optimize cool airflow Optimizing cooling in a data center To optimize left to right cooling perform the following tasks Increase the space between each Virtual Ser...

Страница 67: ...hassis 3 Front of VSP 9012 chassis 4 Baffle 5 7 Hot aisles 6 Cold aisle 8 to 13 Other equipment front to back cooling Other cooling considerations This table offers suggestions for other cooling consi...

Страница 68: ...management can decrease the capacity of the cooling modules For instance the following diagram shows how cable management blocks two out of four fans in a row As a result the cooling module can only...

Страница 69: ...ithin the specified range Important To ensure efficient cooling both the air intake left side of the chassis and air exhaust right side of the chassis require a minimum of 6 inches 152 4 mm of distanc...

Страница 70: ...d to mount the chassis in a rack depends on your rack type 12 Phillips head screws 12 clip nuts Mount the chassis to a rack rail Use the clip nuts if necessary 4 Phillips head screws 4 hex nuts Mount...

Страница 71: ...k type You need a Phillips screwdriver to install the Virtual Services Platform 9012 chassis in a standard rail type equipment rack if using Avaya supplied screws Install the device in standard EIA 31...

Страница 72: ...container match those on the shipment packing list Verify that you have all other required hardware About this task Warning Only trained service personnel must perform the procedures in this section...

Страница 73: ...the installation shelf The installation shelf is an optional item used for installation of the chassis in a rack You can mount a chassis on top of another Virtual Services Platform 9000 chassis instea...

Страница 74: ...s for your specific rack model 3 Place the installation shelf at the mark on the rack inside the rails Hold the installation shelf in position and then align the mounting rail with the two holes on ea...

Страница 75: ...d to reduce the risk of personal injury or equipment damage Procedure 1 Remove the 10 I O filler modules from the front of the chassis 2 Remove the two cooling modules from the front of the chassis Vi...

Страница 76: ...ning the 2 captive screws grasping the two handles and gently pulling the module out and away from the chassis Virtual Services Platform 9012 chassis October 2015 Installing the Avaya VSP 9000 76 Comm...

Страница 77: ...in that holds it in place while gently pulling the handle on the module to move it out and away from the chassis Virtual Services Platform 9012 chassis installation October 2015 Installing the Avaya V...

Страница 78: ...three people to lift Always use a mechanical lift when one is available Before you begin Important Reduce the weight of the chassis as much as possible before you lift it Always use a mechanical lift...

Страница 79: ...with the holes on either side of the vertical rack support 2 Ensure that the 7 hole pairs on either side of the rack vertical supports match horizontally 3 Insert 4 Phillips screws through each hole...

Страница 80: ...nt Do not attach any cables until after the bracket installation Procedure 1 Attach the three Z brackets to the vertical cable bracket as shown below using 6 of the screws provided Nuts are not requir...

Страница 81: ...cable management assembly to the top middle and bottom screw positions of the left flange and rail Virtual Services Platform 9012 chassis installation October 2015 Installing the Avaya VSP 9000 81 Co...

Страница 82: ...install power supplies or connect power and network cables to the system Before you begin Ensure you have a two hole cable lug that fits over the grounding studs Ensure you have a nut and a locking w...

Страница 83: ...of the back of the chassis 3 Bond the chassis ground cable to the single point ground window Job aid The following figure shows an example of how to attach the chassis ground cable to the rack ground...

Страница 84: ...Figure 21 Rack grounding strip example Virtual Services Platform 9012 chassis October 2015 Installing the Avaya VSP 9000 84 Comments on this document infodev avaya com...

Страница 85: ...ch the port and module LEDs display various patterns to indicate the progress of the self test Upon successful completion of the self test within 5 to 15 minutes after you apply power depending on the...

Страница 86: ...ge 99 About this task To determine how many power supplies you need you can also download ERS 8000 VSP 9000 Power Supply Calculator NN48500 519 from the System Management Planning section of the Virtu...

Страница 87: ...module in SF1 are running and also that the first CP module displays at the console login prompt and then insert the second CP module in slot 2 It can take several minutes for the CP module in slot 2...

Страница 88: ...14 14 00 22 909 0x00034595 00000000 GlobalRouter SW INFO VSP 9000 System Software Release 3 4 5 0_B002 CP1 12 10 14 14 00 24 991 0x00010704 00000000 GlobalRouter HW INFO Waiting for CAN initializatio...

Страница 89: ...10 14 14 00 33 481 0x00300604 00000000 GlobalRouter SLAMON INFO slamonLoop Entering main loop CP1 12 10 14 14 00 58 561 0x00264503 00000000 GlobalRouter SW INFO Slot SF1 IMAGE SYNC Running pre instal...

Страница 90: ...4 14 13 03 140 0x00264503 00000000 GlobalRouter SW WARNING Slot 2 Reset due to image sync upgrade CP1 12 10 14 14 13 05 417 0x0001080e 00000000 GlobalRouter HW WARNING Reset Detected for module 9080CP...

Страница 91: ...2 10 14 17 49 13 898 0x00010830 00000000 GlobalRouter HW INFO Detected 9090SF module Serial SSCHJW02YP in slot SF 4 CP1 12 10 14 17 49 13 898 0x0001081d 00400010 24 DYNAMIC CLEAR GlobalRouter HW INFO...

Страница 92: ...14 17 56 49 802 0x00264532 00000000 GlobalRouter SW INFO Slot 9 FPGAs updated Rebooting CP1 12 10 14 17 56 49 828 0x00264503 00000000 GlobalRouter SW WARNING Slot 9 Reset due to image sync upgrade CP1...

Страница 93: ...supplies could stay or enter current limit based on the system load condition until you power on a sufficient number of power supplies to guarantee the system powers on 7 Verify the power LEDs on eac...

Страница 94: ...e clearance between the insertion lever and the gasket on adjacent modules during insertion or extraction Do not stack modules one on top of the other when you move them Do not leave slots open Fill a...

Страница 95: ...bled To disable PCAP use the no pcap enable command Debugging features are enabled The debug config file and trace logging flags must be disabled which is the default Use the show boot config flags co...

Страница 96: ...automatically recognizes them The devices are accessible within seconds after insertion After you insert the external Compact Flash enable logging to the external Compact Flash with the logging logTo...

Страница 97: ...Resetting the Avaya Virtual Services Platform 9000 October 2015 Installing the Avaya VSP 9000 97 Comments on this document infodev avaya com...

Страница 98: ...Input current 13 3 A 100 VAC 11 2 A 120 VAC 11 8 A 200 VAC 9 9 A 240 VAC Operating frequency range 47 63 Hz 47 63 Hz Input volt ampere VA 1445 VA 2325 VA Efficiency 85 minimum 90 typical 88 minimum 93...

Страница 99: ...1 900 W for a pair of 9010CM cooling modules that operate at full speed Virtual Services Platform 9010 chassis only The Virtual Services Platform 9012 reserves the following power requirements 80 watt...

Страница 100: ...e slots 2 3 5 and 6 50 170 9012FC Side cooling module Maximum fan speed 150 512 9012RC Fabric cooling module Maximum fan speed 65 222 9012FCHS cooling module Maximum fan speed Note If you use second g...

Страница 101: ...e Virtual Services Platform 9010 chassis does not comply with Network Equipment Building Standard NEBS Level 3 as specified in SR3580 Environmental specifications The following environmental specifica...

Страница 102: ...N 61000 3 3 1995 A1 2001 A2 2005 Australia New Zealand AS NZS CISPR 22 2006 Class A Japan VCCI V3 97 04 Class A Electromagnetic immunity The Virtual Services Platform 9010 chassis conforms to the foll...

Страница 103: ...nd midplane and cooling modules 183 lb 83 kg Network Equipment Building Standard The Virtual Services Platform 9012 chassis does not comply with Network Equipment Building Standard NEBS Level 3 as spe...

Страница 104: ...386 v1 3 3 EN55024 1998 A1 2001 A2 2003 EN 61000 3 3 1995 A1 2001 A2 2005 Australia New Zealand AS NZS CISPR 22 2006 Class A Japan VCCI V3 97 04 Class A Electromagnetic immunity The Virtual Services...

Страница 105: ...1 Canada CSA 22 2 No IEC 60950 1 Europe ENIEC 60950 1 CE Marking Australia New Zealand AS NZS IEC 60950 1 Mexico NOM VSP 9012 chassis specifications October 2015 Installing the Avaya VSP 9000 105 Comm...

Страница 106: ...6 9080CP CP module EC1404008 E6 9012QQ 2 12 QSFP I O module EC1404009 E6 9095SF Switch Fabric module for the VSP 9010 chassis EC1405A01 E6 9006AC power supply EC1411001 E6 9012FC Side cooling module f...

Страница 107: ...010 Chassis Cover Panel Kit Includes the cable management cover and air inlet cover EC1411016 E6 VSP 9024XL Ventilation Cover for VSP 9010 chassis October 2015 Installing the Avaya VSP 9000 107 Commen...

Страница 108: ...ionnement de cet quipement dans une zone r sidentielle risque de causer des interf rences nuisibles auquel cas l utilisateur devra y rem dier ses propres frais Warning WARNUNG Dies ist ein Ger t der K...

Страница 109: ...device Electrostatic alert ELEKTROSTATIKWARNUNG Elektronische Schaltkreise k nnen durch elektrostatische Entladung besch digt werden Ber hren Sie elektronische Hardware nur wenn Sie ein Erdungsarmban...

Страница 110: ...c cables are connected to a light source Danger DANGER Risques de blessure oculaire par lumi re laser L quipement de fibres optiques peut mettre une lumi re laser ou infrarouge nuisible vos yeux Ne re...

Страница 111: ...rdare mai all interno di una porta di connessione o una fibra ottica Tenere sempre presente che i cavi a fibra ottica sono collegati a una sorgente luminosa Lifting chassis danger statement Danger Ris...

Страница 112: ...rlo Electric shock multiple cord danger statement Voltage Risk of injury by electric shock This unit has more than one power supply cord Disconnect all power supply cords before servicing to avoid ele...

Страница 113: ...onecte todos os cabos de alimenta o antes da manuten o para evitar choque el trico Voltage Riesgo de sufrir descargas el ctricas Esta unidad tiene m s de un cable de suministro de alimentaci n Descone...

Страница 114: ...f the chassis I O cooling module 9012FC The I O cooling module is a hot swappable fan tray used to cool the I O and CP modules in the Virtual Services Platform 9012 I O cooling module 9012FCHS The I O...

Страница 115: ...odule connects to all I O and Control Processor modules You can install 6 SF modules in Virtual Services Platform 9000 using 5 SF modules plus 1 as a hot backup The SF modules comprise a data path and...

Отзывы: