Chapter 4: Preinstallation checklist
Preinstallation checklist
Before you install the Avaya Virtual Services Platform 7200 Series, make sure that you complete the
tasks in the preinstallation checklist.
Important:
Make sure the air flow direction of your
power supplies
and
fan modules
match the same
direction (either front-to-back or back-to-front).
No.
Task
Description
1.
Review the technical specification for
the switch. Make sure that the area
where you install the switch and where
it will operate meet the requirements.
For the physical, electrical, and environmental
specifications, see
page 19.
2.
Verify the power supply unit (PSU)
specifications. Optionally order a
redundant PSU to provide redundancy
and load sharing.
on
page 24 or
on page 8 for part
numbers.
3.
Verify that the fan module air flow is
going in the same direction as the
power supplies (either front-to-back or
back-to-front). Optionally order
redundant fan modules.
To order redundant fan modules, see
Hardware models for VSP 7200 Series
on
page 8 for part numbers.
4.
Make sure that you have the following
tools and cables:
• Phillips #2 screwdriver
• RJ-45 console port cable
• ESD cable
Cable requirements for the VSP 7200
on page 72.
5.
Unpack the equipment.
Observe ESD precautions when you unpack
the equipment. See
page 18.