
Page 26 - Introduction
IP
IP Office System Programming
Introduction
This section covers only the most basic aspects of system programming required
to install an IP Office system. When first powered up, all IP Office systems will
operate as a simple PBX. However, full system programming is highly dependent
on customer requirements. The Administration CD (supplied with each system)
contains the suite of programs required to install and maintain the IP Office
system. These should have been loaded earlier (see page 12).Once loaded, inter-
active
Help
files provide all the instructions and details required to operate and
administer the program suite.
On completion of the mechanical installation of the Media Gateway components
(see page 15) and INDeX to IP Office data transfer (see page 13) refer to the IP
Office Manager application manual, or use the Help files, to configure your new IP
Office system.
Notes:
1. When applying power to the IP Office system, the INDeX Media
Gateway and the Expansion Modules
must be
switched on
first.
If the
main IP Office Module does not detect an item at power on it will never
use it. If power is switched on from a central point for all modules, then,
as the IP Office 406/412 unit is the slowest to start, this will be taken
care of automatically.
2. When powered up correctly, all modules will display a steady green light
in the centre of each module. When connection is established with
ports, the port socket on the appropriate module will show a green LED,
e.g. the hub port connected to your PC for programming. IP Office
systems are ready for use within 1 minute of power on.
CAUTION:
There is limited hot maintenance available with INDeX Media Gateway
i.e. a cassette may be swapped like for like without powering down the
system. It is not possible to add DSLC’s or change the size of an
existing DSLC with the system running.
If Media Gateway is switched off, a blue cable/link cassette cable is
removed or if the IP406/412 is switched off then the whole system has
to be power cycled and switched back on using the sequence, INDeX
cabinets first, then Media Gateway, then Expansion units with the
IP406/412 last.
Page 26 - IP Office System Programming
Installation Manual
38DHB0002UKGA Issue 1 (12/05/2004)
INDeX Media Gateway