INSTALLATION
Avaya 9130 EBM Site Preparation, Installation and Operator’s Manual
S
164201770 Rev 1
22
NOTE
Leave
ribbon cable
connected.
Figure 6. Removing the UPS Right Front Cover
2.
On the bottom of the UPS right front cover, remove the EBM cable
knockout (see Figure 7).
NOTE
Use care to protect the LCD control panel and the connected ribbon cable from
damage.
esc
Knockout for EBM Cable
Figure 7. Removing the EBM Cable Knockout
3.
Remove the front cover of each EBM (see Figure 8).
To remove the cover, remove and retain the two screws on the
right side of the cover. Grasp the sides of the cover and slide the
cover to the
left
and then away from the cabinet.
Содержание 9130 EBM
Страница 15: ...INTRODUCTION Avaya 9130 EBM Site Preparation Installation and Operator s Manual S 164201770 Rev 1 11 S S S...
Страница 18: ...INTRODUCTION Avaya 9130 EBM Site Preparation Installation and Operator s Manual S 164201770 Rev 1 14...
Страница 30: ...INSTALLATION Avaya 9130 EBM Site Preparation Installation and Operator s Manual S 164201770 Rev 1 26...
Страница 34: ...OPERATION Avaya 9130 EBM Site Preparation Installation and Operator s Manual S 164201770 Rev 1 30...
Страница 42: ...MAINTENANCE Avaya 9130 EBM Site Preparation Installation and Operator s Manual S 164201770 Rev 1 38...
Страница 46: ...SERVICE AND SUPPORT Avaya 9130 EBM Site Preparation Installation and Operator s Manual S 164201770 Rev 1 42...
Страница 47: ......
Страница 48: ...1642017701 164201770 1...