INSTALLATION
Avaya 9130 EBM Site Preparation, Installation and Operator’s Manual
S
164201770 Rev 1
20
NOTE
There are two sets of four mounting holes on each side of the EBM: a forward
position and a middle position. Choose the position that meets your configuration needs.
Mounting
Bracket
M4
×
8 Flat-Head
Screws (4 places)
Figure 3. Installing the Mounting Brackets (Forward Position Shown)
10.
If installing more than one EBM, repeat Steps 8 and 9 for each
cabinet.
11.
Slide the cabinet(s) into the rack.
12.
Secure the front of the EBM to the rack using two M6
×
16
pan-head screws and two M6 cage nuts on each side (see
Figure 4). Install the bottom screw on each side through the bottom
hole of the mounting bracket and the bottom hole of the rail.
Repeat for any additional EBMs.
M6
×
16 Pan-Head
Screws (4 places)
M6 Cage Nuts
(4 places)
Figure 4. Securing the Front of the Cabinet
Содержание 9130 EBM
Страница 15: ...INTRODUCTION Avaya 9130 EBM Site Preparation Installation and Operator s Manual S 164201770 Rev 1 11 S S S...
Страница 18: ...INTRODUCTION Avaya 9130 EBM Site Preparation Installation and Operator s Manual S 164201770 Rev 1 14...
Страница 30: ...INSTALLATION Avaya 9130 EBM Site Preparation Installation and Operator s Manual S 164201770 Rev 1 26...
Страница 34: ...OPERATION Avaya 9130 EBM Site Preparation Installation and Operator s Manual S 164201770 Rev 1 30...
Страница 42: ...MAINTENANCE Avaya 9130 EBM Site Preparation Installation and Operator s Manual S 164201770 Rev 1 38...
Страница 46: ...SERVICE AND SUPPORT Avaya 9130 EBM Site Preparation Installation and Operator s Manual S 164201770 Rev 1 42...
Страница 47: ......
Страница 48: ...1642017701 164201770 1...