Avanti OCTOPUS L95 HD Скачать руководство пользователя страница 18

1

5SBWFMMJOHDBCMF

4RAVELLINGCABLE

Function/System

Operations

1.Inspect the travelling cable pulley is free of damage.

2.Inspect the travelling cable is free of squeeze marks and the isolation of the cable is present

and free of damages.

4RACTIONWIREROPE

Function/System

Operations

5SBDUJPOBOETBGFUZXJSFSPQFT

5SBDUJPOXJSFSPQF

$MFBOJOH

+EEPALWAYSTHETRACTIONWIREROPECLEANANDSLIGHTLYGREASY/NLYUSEMECHANICALMEANSTOCLEANTHEDIRTYWIREROPESIEA
CLOTHORAHANDBRUSH$ONOTUSESOLVENTSOROTHERDETERGENTS

*OTQFDUJPOBOEEJTDBSEDSJUFSJB

./4)#%

When measuring the diameter of the wire ropes, use a 
digital calliper with broad measuring faces. 

#!54)/.

Rotate the calliper around the wire rope to measure 
the minimum and maximum wire rope diameter at 
each measurement point. 

1. Inspect all the wire ropes along their entire length, paying special attention to the wire rope

ends, parts of the wire ropes running over sheaves and wire ropes under frictional wear by

external components.

-Traction wire rope is clean and slightly greased with a standard multipurpose grease free of

disulphite.

-Traction wire rope is free of deformations and squeeze marks and there are no wire strands

broken.

-There is no severe corrosion on the surface or the inside of the traction wire rope.

-The traction wire rope is free of heat damages (Evident by blue discolouration).

2.Inspect the traction wire rope is properly mounted according to the manual, with an 11kg.

counterweight and the 2 wire rope locks. The traction wire rope is properly coiled up and 

fixed with 3 cable ties and the counterweight is able to rotate freely.
3.Inspect the traction wire rope diameter is more than 7,6 mm at any point.

In general, measure the diameter of the wire rope at each WTG tower platform, and under 

the service lift, where the wire rope is less loaded. Specifically, if a wire rope wear is 

detected, measure on the affected area.

4.Inspect the top beam is properly mounted and properly tightened to the WTG. If welded, the
top beam´s weldings are in good condition and not showing corrosion.

5.Inspect the nuts of the shackles at top beam are locked with a cotter pin.
6.Inspect the length between the top end of each wire rope and its ferrule is equal to or more

than 0 mm.
7.

*OYIGXJIXOZKXOG

. Inspect and replace the traction wire rope if one of the following defects is

found:

-In case there are more than one 4-wire strand break on a wire rope length of 250 mm.

-In case there is severe corrosion on the surface or the inside.

-In case there is heat damage, evident by the wire rope colour.

-In case the wire rope diameter is less than 7,6 mm.
-In case there is damage on the wire rope surface. 

(See

 

Figure

 

10

:

 

Wire

 

rope

 

damage  examples)

./4)#%

Record any visible change of the condition of the wire 
ropes on the Inspection and maintenance Log Sheet 
Appendix., and monitor closely throughout time. 

1

5

#!54)/.

Determine and eliminate the cause before installing 
a new wire rope.  

#!54)/.

AVANTI recommends to replace the traction and 
safety wire ropes after 250 hours of operation 
corresponding with the refurbishment of the traction 
hoist and fall arrest device. Please check with your 
local authority regulations if it’s mandatory in your 
case. 

Содержание OCTOPUS L95 HD

Страница 1: ...l OCTOPUS L95 HD Service Lift Installation and maintenance manual Original instructions AT00016129 English EN Installation and maintenance Manual Service Lift Model OCTOPUS L95 HD 3rd Edition July 201...

Страница 2: ......

Страница 3: ...ons from Avanti iii has been subjected to abuse neglect casualty or negligence iv has been furnished by Avanti to Customer without charge or v has been sold on an AS IS basis Except as specifically se...

Страница 4: ...5 3 Power supply 5 1 5 4 Beam 5 1 5 5 Fences 5 1 5 6 Lighting 5 1 5 7 Other requirements 5 3 3 Electrical connections 6 3 4 2 Safety wire rope 8 3 5 Guiding system 9 3 5 1 Guiding ladder 9 3 6 Top li...

Страница 5: ...ropes 15 4 3 8 Guiding system 18 4 3 9 Top limit device 18 4 3 10 Landing interlock system 19 4 3 11 Overload check and adjustment 19 4 3 12 Information signs and documents 19 4 5 Ordering spare parts...

Страница 6: ...for the task Manual descent Also manual no powerdescent Action performed to descend the lift at a controlled speed without power supply by manually opening the hoist electromagnetic brake 1 3 Observat...

Страница 7: ...aintenance operation check that the service lift is properly out of service CAUTION Avoid injury follow all instructions If any damage or faults are found during operation or if circumstances arise wh...

Страница 8: ...l be equipped with a door sliding and or swinging monitored with a trapped key system Optionally and apart from the trapped key system the platform fence doors for the Octopus L95 HD service lift coul...

Страница 9: ...shackles supplied for the top beam at the top of the tower 4 Attach coiled wire ropes to top beam by means of cable strips to prevent them from moving during transport of tower section 5 Position serv...

Страница 10: ...pulling Ensure that the wire rope can exit without obstruction 4 Feed the wire rope through the guide bushings of service lift 5 Feed the wire rope through the guide bushing of the travelling cable p...

Страница 11: ...o that the spring decompresses to 55 mm If the counterweights are installed follow this procedure 1 Mount two 11 kg counterweights on the safety wire rope 2 Secure them by using 2 wire clips To instal...

Страница 12: ...the lift in alignment with the top landing platform To make sure not to hit the top beam place first the top stop limit device about 2800mm from the top platform floor Measure the distance the lift st...

Страница 13: ...signs and warnings 3 8 1 Rescue guide Place the Rescue Guide in a visible place next to the Rescue pendant control on the bottom platform fence 3 9 Inspection before first use A certified technician...

Страница 14: ...ety switches Interlock system Platforms CertifiedTechnician Fallarrestdevice CertifiedTechnician Tractionhoist Every20yearsor250 hoursofoperation whateveroccursfirst AtAvantiWorkshop Tractionhoist Fal...

Страница 15: ...ounted in accordance with the specifications and without any noticeable defects or missing components Platform control boxes Traction and safety wire ropes Guiding system guiding ladder Travelling cab...

Страница 16: ...ternal cabin control Automatic Send 1 Inspect the external UP and DOWN buttons of the main user control box are all fully functional External buttons of the main user control box respond with a delay...

Страница 17: ...e the wire rope and wire rope fastenings Fall arrest device Function System Operations 4 3 5 Fall arrest device The fall arrest device shall be maintained according to maintenance planning please see...

Страница 18: ...e traction wire rope is properly coiled up and fixed with 3 cable ties and the counterweight is able to rotate freely 3 Inspect the traction wire rope diameter is more than 7 6 mm at any point In gene...

Страница 19: ...ch cannot be unwound PPQ LOPU forming when a wire loop is pulled tight FOET resulting from inappropriate treatment e g securing the load with the wire BNBHF resulting from crushing squeezing running o...

Страница 20: ...wear is detected measure on the affected area 5 NSPECT THE TOP BEAM IS PROPERLY MOUNTED AND PROPERLY TIGHTENED TO THE 74 F WELDED THE TOP BEAM S WELDINGS ARE IN GOOD CONDITION AND NOT SHOWING CORROSIO...

Страница 21: ...are properly installed 2 Inspect that outer surface of guiding rollers is uniform does not show breaks and is free of damage 3 Inspect if wear of surface of guiding rollers is not be bigger than 1 mm...

Страница 22: ...ion device Appendix 4 3 12 Information signs and documents Information signs and documents Function System Operations Verify availability and legibility of all data plates and information signs Replac...

Страница 23: ...y also be performed by 3rd party inspectors following national regulations depending on the country a Overload setup instruction Follow the overload setup instruction workflow b Overload test instruct...

Страница 24: ...lationandmaintenance LogSheet Reviewthesetupload 1 thathasbeenused 1 Insertthetool 2 throughthehole 3 2 Turnthetool 3 clockwisetoincreasethetriggerlimitoftheoverloadlimiter 3 Removethetool 2 fromtheho...

Страница 25: ...are obliged to read and understand this User Manual Further they need to be proper equipped and instructed with the use of the necessary fall arrest equipment and emergency procedures in case of inju...

Страница 26: ...e contact AVANTI Before installing the AVANTI LIFT ANCHOR in heights assure to be proper secured against fall from height by using relevant fall arrest equipment AVANTI LIFT ANCHOR 1 Fix the anchor po...

Страница 27: ...ft serial no Lift model Wind farm WTG no Installed by Installation company OK not OK 1 Lift structure does not show any deterioration 2 Anchor locking screws are fully inserted and tightened with 15 N...

Страница 28: ...ory Date Reason for entry per exam OK not OK Inspector Periodic exam next due date Avanti lift Anchor Identification no 7 Registration form of anchor 33 Avanti Wind System Technology S L Calle ngeles...

Страница 29: ...18 Service Lift Installation and maintenance Manual Model Octopus L95 HD 01 02 02 01 10 2018 Added caution in section 3 5 1 03 2019 EC Certificate updated Manufacturer updated to Avanti Wind Systems T...

Страница 30: ......

Страница 31: ......

Страница 32: ...www avanti online com...

Отзывы: