  NOTICE

Certified  technicians  must  carry  out  an  inspection 
before  first  use  following  the  “Inspection  and 
maintenance Checklist” Appendix.

  NOTICE

The inspection before first use must be recorded for 
future  reference  filling  the  “Installation  and 
maintenance Log Sheet” Appendix.

3.

10

 

Disassembling

Disassemble  in  reverse  order  and  dispose  of  in 
accordance with local authority regulations.

If  the  lift  is  not  functional,  the  operations  performed 
from  the  lift  will  have  to  be  carried  out  using  the 
appropriate  mechanical  or  electrical  help  and  taking all 
the  extra  precautions  needed  in  order  to  perform the  job 
in  a  safe manner.

The  steps  to  follow  may  differ  from  one  installation to 
another  depending  on  the  circumstances  (such  as  the 
overall  dismantling  tasks  –  or  others-  taking  place in  the 
wind farm) and means available (cranes, etc.).

10

3.

7

.

3

 

Safe zone plates

Adjust  the  final  position  of  the  safe  zone  plate  on  each 

platform,  so  that  the  service  lift  floor  is  levelled  with  the 

platform floor when it stops.

3.

8

 

Information signs and warnings

3.

8

.1 

Rescue guide

Place  the  “Rescue  Guide”  in  a  visible  place  next  to  the 

Rescue pendant control on the bottom platform fence.

3.

9

 

Inspection before first use

A certified technician must carry out an inspection before 

first  use  following  the  Annual  inspection  procedure  and  

filling in the Inspection and maintenance checklist.

3.

7

.

2 Guard locking

 system

The  guard  locking  system  blocks  the  fence  door  when 
the service lift is not on the platform.

The service lift detection switch on the platform unlocks the 
electromechanical 

locking 

door 

switch 

when 

detecting the position of the service lift in the platform.

Place and fix correctly the service lift detection switch on the 
platform so that it activates correctly when the position of 
the service lift on the platform is appropriate.

The electromechanical locking switch must be properly 
adjusted and tightened to the platform fence and fully 
functional.

1b

1a

2

1

1c

1d

Figure

 

8

: Guard locking system

Guard locking system

1

1a

1b

1c

1d

2

Electromechanical locking switch

Manual emergency unlocking (interior of the fence) 

Manual emergency unlocking (external of the fence) 

Actuator

Opening button (normal use)

Service lift detection switch on platform

Содержание OCTOPUS L95 HD

Страница 1: ...l OCTOPUS L95 HD Service Lift Installation and maintenance manual Original instructions AT00016129 English EN Installation and maintenance Manual Service Lift Model OCTOPUS L95 HD 3rd Edition July 201...

Страница 2: ......

Страница 3: ...ons from Avanti iii has been subjected to abuse neglect casualty or negligence iv has been furnished by Avanti to Customer without charge or v has been sold on an AS IS basis Except as specifically se...

Страница 4: ...5 3 Power supply 5 1 5 4 Beam 5 1 5 5 Fences 5 1 5 6 Lighting 5 1 5 7 Other requirements 5 3 3 Electrical connections 6 3 4 2 Safety wire rope 8 3 5 Guiding system 9 3 5 1 Guiding ladder 9 3 6 Top li...

Страница 5: ...ropes 15 4 3 8 Guiding system 18 4 3 9 Top limit device 18 4 3 10 Landing interlock system 19 4 3 11 Overload check and adjustment 19 4 3 12 Information signs and documents 19 4 5 Ordering spare parts...

Страница 6: ...for the task Manual descent Also manual no powerdescent Action performed to descend the lift at a controlled speed without power supply by manually opening the hoist electromagnetic brake 1 3 Observat...

Страница 7: ...aintenance operation check that the service lift is properly out of service CAUTION Avoid injury follow all instructions If any damage or faults are found during operation or if circumstances arise wh...

Страница 8: ...l be equipped with a door sliding and or swinging monitored with a trapped key system Optionally and apart from the trapped key system the platform fence doors for the Octopus L95 HD service lift coul...

Страница 9: ...shackles supplied for the top beam at the top of the tower 4 Attach coiled wire ropes to top beam by means of cable strips to prevent them from moving during transport of tower section 5 Position serv...

Страница 10: ...pulling Ensure that the wire rope can exit without obstruction 4 Feed the wire rope through the guide bushings of service lift 5 Feed the wire rope through the guide bushing of the travelling cable p...

Страница 11: ...o that the spring decompresses to 55 mm If the counterweights are installed follow this procedure 1 Mount two 11 kg counterweights on the safety wire rope 2 Secure them by using 2 wire clips To instal...

Страница 12: ...the lift in alignment with the top landing platform To make sure not to hit the top beam place first the top stop limit device about 2800mm from the top platform floor Measure the distance the lift st...

Страница 13: ...signs and warnings 3 8 1 Rescue guide Place the Rescue Guide in a visible place next to the Rescue pendant control on the bottom platform fence 3 9 Inspection before first use A certified technician...

Страница 14: ...ety switches Interlock system Platforms CertifiedTechnician Fallarrestdevice CertifiedTechnician Tractionhoist Every20yearsor250 hoursofoperation whateveroccursfirst AtAvantiWorkshop Tractionhoist Fal...

Страница 15: ...ounted in accordance with the specifications and without any noticeable defects or missing components Platform control boxes Traction and safety wire ropes Guiding system guiding ladder Travelling cab...

Страница 16: ...ternal cabin control Automatic Send 1 Inspect the external UP and DOWN buttons of the main user control box are all fully functional External buttons of the main user control box respond with a delay...

Страница 17: ...e the wire rope and wire rope fastenings Fall arrest device Function System Operations 4 3 5 Fall arrest device The fall arrest device shall be maintained according to maintenance planning please see...

Страница 18: ...e traction wire rope is properly coiled up and fixed with 3 cable ties and the counterweight is able to rotate freely 3 Inspect the traction wire rope diameter is more than 7 6 mm at any point In gene...

Страница 19: ...ch cannot be unwound PPQ LOPU forming when a wire loop is pulled tight FOET resulting from inappropriate treatment e g securing the load with the wire BNBHF resulting from crushing squeezing running o...

Страница 20: ...wear is detected measure on the affected area 5 NSPECT THE TOP BEAM IS PROPERLY MOUNTED AND PROPERLY TIGHTENED TO THE 74 F WELDED THE TOP BEAM S WELDINGS ARE IN GOOD CONDITION AND NOT SHOWING CORROSIO...

Страница 21: ...are properly installed 2 Inspect that outer surface of guiding rollers is uniform does not show breaks and is free of damage 3 Inspect if wear of surface of guiding rollers is not be bigger than 1 mm...

Страница 22: ...ion device Appendix 4 3 12 Information signs and documents Information signs and documents Function System Operations Verify availability and legibility of all data plates and information signs Replac...

Страница 23: ...y also be performed by 3rd party inspectors following national regulations depending on the country a Overload setup instruction Follow the overload setup instruction workflow b Overload test instruct...

Страница 24: ...lationandmaintenance LogSheet Reviewthesetupload 1 thathasbeenused 1 Insertthetool 2 throughthehole 3 2 Turnthetool 3 clockwisetoincreasethetriggerlimitoftheoverloadlimiter 3 Removethetool 2 fromtheho...

Страница 25: ...are obliged to read and understand this User Manual Further they need to be proper equipped and instructed with the use of the necessary fall arrest equipment and emergency procedures in case of inju...

Страница 26: ...e contact AVANTI Before installing the AVANTI LIFT ANCHOR in heights assure to be proper secured against fall from height by using relevant fall arrest equipment AVANTI LIFT ANCHOR 1 Fix the anchor po...

Страница 27: ...ft serial no Lift model Wind farm WTG no Installed by Installation company OK not OK 1 Lift structure does not show any deterioration 2 Anchor locking screws are fully inserted and tightened with 15 N...

Страница 28: ...ory Date Reason for entry per exam OK not OK Inspector Periodic exam next due date Avanti lift Anchor Identification no 7 Registration form of anchor 33 Avanti Wind System Technology S L Calle ngeles...

Страница 29: ...18 Service Lift Installation and maintenance Manual Model Octopus L95 HD 01 02 02 01 10 2018 Added caution in section 3 5 1 03 2019 EC Certificate updated Manufacturer updated to Avanti Wind Systems T...

Страница 30: ......

Страница 31: ......

Страница 32: ...www avanti online com...

Отзывы: