Operation
31
© Travis Industries
4151204
100-01430
Starting the Pilot
Remove the glass frame before starting the pilot.
Starting the Heater for the First Time
Burn the heater at a high setting with the blower off for an extended period (up to 48 hours). This will
cure the painted surfaces.
Fumes
from the paint curing and oil burning off the steel will occur. This
is normal. We recommend opening a window to vent the room.
Condensation
may appear on the glass each time you start the heater - this is normal.
Blue Flames
will occur on the heater when it first comes on. After fifteen minutes the flames will turn
a more realistic yellow and orange color.
Verify the power backup and control light batteries are installed (see page 37).
Содержание Radiant Plus Small Insert
Страница 32: ...32 Operation Travis Industries 4151204 100 01430 Remote Control Operation ...
Страница 33: ...Operation 33 Travis Industries 4151204 100 01430 Remote Control Operation continued ...
Страница 34: ...34 Operation Travis Industries 4151204 100 01430 Remote Control Operation continued ...
Страница 35: ...Operation 35 Travis Industries 4151204 100 01430 Remote Control Operation continued ...