background image

10. Hanging Systems

Instalation

Chapter - 10

Hanging

In the case of installation locations changing frequently, hanging is usually used,

which is common in the rental market. For the CR OR Series Series, AVA LED provides

customers with a truss and FlyKit for quick haing installation. The following are

detailed steps,  as shown in Picture 10-1. , Picture 10-2.

Picture 10-1. Fly Bar

Preparatory Work

 

1. Select the installation area of the CR OR Series display, and enclose it with 

 

 

a safety warning band. Non-workers should not enter without permission, 

 

 

keep the installation area clean, free from dirt and debris.

 

 

 

2. Ensure that you have read, understood and followed all of the 

 

 

 

security issues mentioned in Chapter 1 before installation.

 

 

3. Make sure that the installed LED cabinet, accessories, tools and other 

 

materials are in place to prevent the troubles.

Picture 10-2. Hanging instalation

Содержание CR OR 500x500 Series

Страница 1: ...User Manuel CR OR 500x500 RENTAL SERIES User Manuel...

Страница 2: ...tact us according to the contact information in the manual We will try our best to solve this problem We sincerely appreciate your suggestions and improve as soon as possible all photos are similar an...

Страница 3: ...e Precise Installation Support Snap Locking system with Magnetism Locating System help one person to install and disassemble within few seconds Supports Various Installation Form Factor Hanging Stacki...

Страница 4: ...2G7 043H 2 3 H 0 2A 88242 H 630 A 3424 0 H 04439 I0 2 D4 JKLF 34 4E E M 3N O73 30 2 G 0 0 2 P 73 42 G83 67338 73 0I20 2 24 3 70 QRH 0 9 73 CD3 0 3 2 4 0880 2 24 G 30 3 70 QR SE T D UV 02 0B3W 8D3 D 3...

Страница 5: ...nstalled must be flat and smooth Console should be used in the installation area Security Tips CR OR series are in line with international safety standards and information technology equipment safety...

Страница 6: ...hould be less than 90 Dustproof Do not place the display in a dusty environment and clean the surface of the display regularly Dehumidification Do not adjust the screen directly to the maximum brightn...

Страница 7: ...disassembling the CR OR series products pay attention to the corners of the cabinet do not be impacted remove or install the protective angle of the cabinet in time and place the anti static carpet o...

Страница 8: ...working voltage is 200 240VAC 50 60Hz main power cable size is 3 2 5mm maximum safety current of cabinet power connector is 16A and the number of cabinets one main power cable carry is as 16 pcs Power...

Страница 9: ...Signal Output Input signal interface is the RJ45 interface These two interfaces are independent of input and output After the signal is connected the system receiving card will automatically recognize...

Страница 10: ...e strictly differentiated between input and output When cascaded the output interface of the cabinet is connected to the next cabinet input 3 Per Main Cable Connection max 16 cabinet as shown in Pictu...

Страница 11: ...and the cabinet As shown in upside Picture the CR OR series cabinet consists of four modules The cabinet size is 500 500mm Description of the accessories on the cabinet 1 Door Lock 2 Handle with hangi...

Страница 12: ...16A as shown in Picture 6 1 In the Picture 1 is the aviation head connected to the cabinet and 2 is the mains open We will provide different open according to different countries Picture 6 1 Main Pow...

Страница 13: ...nting Accessories Chapter 6 Fly Bar Lift the display when lifting as shown in Picture 6 5 For holding the truss Picture 6 5 Fly Bar Plate Screw 2 Cabinet combined as shown in Picture 6 6 Picture 6 6 P...

Страница 14: ...et Signal Cable Connects the signal between the cabinet and the cabinet and exceeds the five types of network cables as shown in Picture 6 4 Picture 6 5 Cabinet Signal Cable Picture 6 3 Cabinet Power...

Страница 15: ...nt and back of the shown in Picture 7 1 Picture 7 1 Processor Picture 7 2 Multiplayer Multiplayer Receivers and Multiplayer the DVI video signal and sends the video data to the receiving card through...

Страница 16: ...trol software installed on the computer can set the display parameters display brightness adjustment and other functions The software interface Use Armour Series receving card is shown in Picture 7 3...

Страница 17: ...alation 1 First wear anti static gloves and operate with more than one person 2 Take off the cabinet from the flightcase in a slowly and gentle way and unwrap the PE package and press the automatic pr...

Страница 18: ...1 Picture 10 2 Picture 10 1 Fly Bar Preparatory Work 1 Select the installation area of the CR OR Series display and enclose it with a safety warning band Non workers should not enter without permissio...

Страница 19: ...Rental Screen Floor Instalation The floor where the products will be installed must be smooth and flat if you want to diffrent frame designed you can checking Accessories List...

Страница 20: ...and conduct pre testing to ensure that there is no abnormality before installing 10 2 1 Power Distribution Cabinet Each CR OR Series display requires a power distribution cabinet Samsung provides cust...

Страница 21: ...length of less than 70m Remarks When the transmission distance is greater than 70m it is possible to transmit data by optical fiber and the longest distance is 20 kilometers Cabinet signal cable used...

Страница 22: ...ool Kits Chapter 11 Adjustable Wrench conventional Plastic hammer Allen key M3 is used to open the power cabinet M8 is used to fix the connecting piece Screwdriver medium size Cutting pliers conventio...

Страница 23: ...up as shown below 2 The lock lever is pushed up into position and the lock bar lock lever is as shown below 3 After Click Move the handle to the inside according to the arrow of the cabinet so that t...

Страница 24: ...he lock lever handle according to the UNLOCK direction of the cabinet to the point where it cannot be Initial state When the cabinet is installed the position of the upper right lock and than push the...

Отзывы: